Part of: Garden Suites and Multigenerational Homes

Aging in place

Designing a Home to Age In Place in Ontario

If this is the house you plan to stay in, design it now for the person you will be at 85. Most of it costs very little on paper and a fortune to retrofit after the drywall is up.

For couples in their 50s and 60s building a retirement home, a downsized bungalow, or a house with a parent moving in. What to put on the drawings, what the code does and does not require, and where the money really goes.

Short answer

Build the Last House Once

I meet a lot of people building what they call their last house. Then I look at the plans and see a two-storey with the main bedroom upstairs, a tub you climb into, and three steps at every door. That is not a last house. That is a house you will sell in fifteen years when the knees give out.

Here is the honest part. The Ontario Building Code does not make you build an accessible house. The province says houses, including semi-detached houses, townhouses and duplexes, are not affected by most of the code’s accessibility requirements. The barrier-free section of the code, Section 3.8, is written for public and larger buildings and exempts houses. So nobody is going to force you. You have to ask for it. The federal Home Accessibility Tax Credit is explained in plain English on CanadianTaxes.ai.

The good news is that the barrier-free rules for public buildings make a useful yardstick. Where I quote numbers below, that is where they come from. Your designer can borrow what makes sense and skip what does not.

Bottom line: Get the main-floor layout, door widths, bathroom and stair or elevator space right on paper. Those are expensive to change later. Grab bars, lever handles and lighting can be added any time, as long as the blocking and wiring are already in the walls.

Layout

One-Floor Living and Zero-Step Entries

The single most important decision is this: can you live entirely on the main floor? Kitchen, main bedroom, a full bathroom, laundry and a way in from the car without a step. If yes, you can stay in the house even if stairs become impossible. A basement or second floor is still fine for guests, hobbies and storage.

That pushes a lot of people toward a bungalow, and toward the question of basement or no basement. We cover the trade-offs in slab-on-grade vs basement. A slab makes a zero-step entry much easier because the floor sits close to the ground.

Getting rid of the step at the door

A zero-step entry is a grading and drainage job as much as a door job. The ground has to slope away from the house, the door needs a proper sill, and the garage floor and house floor have to be planned at matching heights. Decide this before the foundation is designed, not after.

If you cannot avoid a change in level, the barrier-free standard for public buildings allows a ramp no steeper than 1 in 12, with level landings top and bottom. That is a long ramp. Most of the time it is better to design the grades so you do not need one.

Getting around

Doors, Halls and the Bathroom That Works at 85

Doors and halls are cheap to make wide on paper and miserable to widen later, because you are moving walls, headers, wiring and sometimes plumbing.

  • Doors. Section 3.8 asks for at least 850 mm of clear opening on a barrier-free route, which is about 33.5 inches. Clear opening is measured with the door open, so the door slab has to be wider than that. Ask your designer which door size gives that clear width with the hinges and stops you are using.
  • Halls. Wide enough to turn into a doorway with a walker, not just walk straight down. One municipal adaptable-housing standard asks for at least 36 inches inside a unit and recommends 48.
  • Thresholds. Flat, or as close to it as the door allows. That same standard caps raised thresholds at 1/4 inch, or 1/2 inch if bevelled.

The bathroom

This is where people fall. Put a curbless walk-in shower on the main floor and plan it before the slab or subfloor is built, because the floor has to be dropped or sloped to drain without a lip. On a slab that means planning the recess before the pour. Doing it later means a saw and a jackhammer.

Leave room to turn. Section 3.8 uses a 1,500 mm turning circle, about 59 inches, for several accessible washroom spaces. Put solid blocking in the walls around the toilet, the shower and the tub so grab bars can go up later in the right place, screwed into wood instead of drywall anchors. Blocking costs almost nothing while the walls are open.

Two storeys

Elevator-Ready: Stacked Closets and the Shaft

If you love a two-storey or need the basement for a suite, plan for a future elevator. You do not need to buy it now. You need the space.

  1. Stack two closets, one above the other, in the size the elevator maker specifies for the model you might want. Get the shaft and pit dimensions from the manufacturer before the plans are final.
  2. Frame the floor so it can be cut out. The structural designer should show a future opening with headers already in place, so later it is a cut, not a structural redesign.
  3. Plan the pit. Some home elevators need a pit. In an ICF basement or slab that is a foundation detail. Leave it out and you are breaking concrete later.
  4. Run power to the closet now, sized for the elevator, so the electrician does not have to fish wire through finished walls.

Also make the main stairs easy: a straight run, a comfortable rise, solid handrails on both sides, and good light. Stairs that are easy at 85 are better at 45 too.

If the plan is a parent moving in, look at an in-law suite, a garage with an apartment, or a separate garden suite in our garden suite guide. Sometimes the best aging-in-place design is two small homes on one lot.

Comfort

Radiant Floors, Lighting and Switches for Older Bodies

Older people feel cold more, and drafts bother them more. This is where ICF and radiant heat really earn their keep.

  • Radiant floors. Warm floors under bare feet, no forced-air drafts, no registers to trip on or block with furniture. The heat is where the person is. More in radiant floor heating and is radiant worth it in Ontario.
  • ICF walls. Even temperatures from wall to wall and quiet rooms. A house that holds its heat is also more forgiving in a power outage, which matters more when the person inside cannot easily leave.
  • Switches and outlets. The same adaptable-housing standard puts switches 40 to 44 inches off the floor and outlets at least 18 inches up. Less bending, less reaching.
  • Lighting. More light than you think you need, light switches at every entry, and low night lighting from the bed to the bathroom.
  • Hardware. Lever door handles and lever faucets instead of knobs. Rocker switches. Easy to use with sore hands.

A heat loss and radiant design done room by room makes sure the floors are warm enough without running hot. Our sister company OntarioHeatLoss.ca does that work.

Money

What It Costs to Plan Now vs Retrofit Later

I am not going to give you a percentage for this, because it depends entirely on what you include. But I can tell you how the money behaves.

Item Planned at design Added after you move in
Wider doors and halls Mostly a drawing change Moving walls, headers, wiring, flooring and paint
Grab bar blocking A few pieces of lumber Opening finished walls and tile
Curbless shower Planned floor recess Cutting the slab or reframing the floor
Elevator space Two stacked closets and a framed opening Structural redesign and lost rooms
Zero-step entry Grading and foundation height Ramps, regrading, new doors

Do not count on tax credits to pay for it. Ontario’s Seniors’ Home Safety Tax Credit covered only the 2021 and 2022 tax years. The federal Home Accessibility Tax Credit allows up to $20,000 a year of eligible expenses for people 65 and older or eligible for the disability tax credit, but CRA describes it in terms of renovations to an existing home. Whether any part of a new build qualifies is a question for your accountant, before you count on it.

Bring your list to the design stage. Our ICF home plans page and our design and permits service are where this gets settled. For the bigger picture on suites and multigenerational living, go back to the garden suites and multigenerational homes hub.

Already have plans?

Send them over. I will mark up what will be hard to live with at 85 and what it would cost to fix now.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Questions people ask

FAQ

Does the Ontario Building Code require a house to be accessible?
No. The province says houses, including semi-detached houses, townhouses and duplexes, are not affected by most of the code’s accessibility requirements, and the barrier-free section exempts houses. You have to ask for accessible features yourself.
How wide should doors be for a wheelchair or walker?
The barrier-free standard for public buildings asks for at least 850 mm of clear opening, about 33.5 inches, measured with the door open. The door slab has to be wider than that, so ask your designer which size gives that clear width.
Can I have a curbless shower on a concrete slab?
Yes, but plan it before the pour. The slab is recessed or sloped where the shower goes so water drains without a lip. Adding one later means cutting concrete.
What does elevator-ready mean?
Two closets stacked in the size the elevator maker specifies, a framed floor opening ready to cut, power run to the space, and a pit planned in the foundation if the model needs one. You buy the elevator only if and when you need it.
Are there tax credits for aging-in-place features?
Ontario’s Seniors’ Home Safety Tax Credit covered only 2021 and 2022. The federal Home Accessibility Tax Credit allows up to $20,000 a year of eligible renovation expenses for people 65 and older or eligible for the disability tax credit. Ask your accountant whether anything in a new build qualifies.
Is a bungalow the only way to age in place?
No. What matters is being able to live entirely on one floor: kitchen, main bedroom, full bathroom, laundry and a step-free way in. A two-storey can work if it is elevator-ready.

Keep going

More in this topic: Garden Suites, In-Laws and Aging in Place

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home