Part of: Best Heating for an ICF Home
Cooling a radiant-heated house
Air Conditioning With Radiant Floor Heat: Your Options
Radiant floors heat a house beautifully, but they do not air condition it. You need a second system for summer, and the cheapest time to choose it is before the walls go up.
This is for people planning radiant floors in a new home who want to stay cool in July without running ducts through the whole house.
Short answer
Radiant Floors Do Not Do Air Conditioning: Plan for It on Day One
I get this question at almost every showhome tour. People love the warm floors, then ask, “And it cools too, right?” No. Hot water in the slab heats the house. Nothing in that system takes heat or moisture out in summer.
That is the trade-off with radiant. A forced-air furnace comes with ducts that an air conditioner can share. A radiant house has no ducts, so cooling is a separate decision. Make it during design, not the first hot week after you move in.
The good news is that an ICF house needs much less cooling than most people expect, so the second system can be small. There are four realistic ways to do it, and the right one depends on your layout, your budget and how much you hate seeing equipment on the wall.
Option 1
Ductless Mini-Splits
A mini-split is a heat pump with an outdoor unit and one or more indoor heads on the wall or ceiling, joined by a small line set. It cools in summer and can heat in shoulder seasons, which takes load off the boiler in spring and fall.
In a tight ICF house, one or two well-placed heads can often handle the main floor. Bedrooms are the hard part. Doors get closed at night, and a head in the hallway does not always reach. Some people add a head upstairs, some accept a slightly warmer bedroom.
Why people pick it
- No ducts needed.
- Very efficient, variable-speed models run slow and steady.
- Can add some heat in spring and fall.
- Easy to zone room by room.
What to watch
- You see the indoor heads.
- Too many heads on one outdoor unit can oversize the small rooms.
- Filters need regular cleaning.
- Plan the line set routes before drywall.
For the bigger picture on heat pumps, read heat pumps in Ontario: the real pros and cons.
Option 2
Short-Run Ducted Units Alongside the HRV or ERV
If you do not want heads on the wall, a small ducted heat pump air handler can cool the house through short duct runs. It usually sits in a central spot, a mechanical room, a bulkhead or an attic space inside the envelope, and feeds a few supply grilles.
Here is a common misunderstanding. Your HRV or ERV already has ducts, so why not blow cold air through those? Because they are sized for fresh air, not for cooling. They do not move enough air to cool a house on their own. What you can do is plan the two systems together: share the chases and bulkheads, and let the ventilation supply connect where it makes sense.
This option needs the most planning, because the ductwork has to fit in the framing. Draw it in before the plans are final. Our page on HRV vs ERV in an ICF home explains the ventilation side.
Option 3
Air-to-Water Heat Pumps: One Machine, Two Jobs
An air-to-water heat pump makes warm water for the floors in winter and chilled water in summer. The chilled water goes to a fan coil or small air handler, which cools and dries the air. One outdoor unit does both jobs, and you skip the separate boiler fuel.
Cold-climate heat pumps have come a long way. Natural Resources Canada says modern units can run reliably down to about -30 C, though colder areas still need some backup heat. A good radiant designer will match the floor water temperature to what the heat pump does well, which usually means low water temperatures and tighter tube spacing.
Can you cool through the floor itself? You can, but carefully. If the floor gets colder than the dew point of the room air, water condenses on it. Floor cooling needs dew-point controls and a separate system to pull moisture out of the air, and it only delivers roughly half of what the same floor does in heating. Nobody should sell you floor cooling without condensation controls.
Our pages on whether radiant floors are worth it and geothermal vs air source heat pumps cover the heating side of this choice.
Moisture
Humidity Control in Summer
In a Georgian Bay summer, humidity makes you more uncomfortable than temperature does. A cool, damp house feels worse than a slightly warmer, dry one. Health Canada recommends keeping indoor humidity between 30% and 50%, and running a dehumidifier when it goes above 50%.
An airtight ICF house keeps outdoor humidity out better than a leaky one, but you still make moisture inside: showers, cooking, breathing, a basement in its first summer. Your cooling system has to pull that moisture out, and an oversized one will not. It cools the air fast, shuts off, and leaves the moisture behind. That is the clammy-basement feeling.
- Size the cooling properly, so it runs long enough to dry the air.
- Consider an ERV, which transfers some moisture, instead of an HRV. Ask your designer.
- Put a dehumidifier in the basement for the first couple of summers while new concrete dries.
- Buy a cheap humidity meter. It tells you more than the thermostat does.
Sizing
Sizing: Why an ICF House Needs Less Cooling Than You Think
Most cooling in a well-insulated house comes from windows, sun and people, not walls. ICF walls are well insulated, airtight and heavy. The concrete soaks up heat during the day and lets the house drift slowly instead of spiking. Big west-facing glass with no shade is what drives the size up.
Sizing should come from a proper heat loss and heat gain calculation under CSA F280, the standard Ontario uses for new houses. Natural Resources Canada’s sizing guide gives a target of 80% to 125% of the design cooling load. Rules of thumb like “one ton per so many square feet” were written for leaky houses and will oversize an ICF home.
Our sister company OntarioHeatLoss.ca does room-by-room heat loss and gain and radiant design, and our page on the heat loss calculation for a new home explains what goes into it.
On rebates: Ontario’s heat pump rebates have mostly been aimed at existing homes switching systems, and new builds have generally not qualified. Programs change, so check before you count on anything. Our page on Ontario heat pump rebates keeps the current list. For the full heating comparison, go back to the best heating for an ICF home.
Planning radiant floors and wondering about summer?
Send your plans. We will look at window area, layout and where the equipment can go, and tell you which cooling option fits before you are locked in.
Free book
How to Build a Home Without Going Broke
Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.
Questions people ask
FAQ
Can radiant floor heating also cool my house?
What is the easiest way to add air conditioning to a radiant-heated house?
Can I use my HRV ducts for air conditioning?
What is an air-to-water heat pump?
How big should the air conditioning be in an ICF house?
What humidity should I keep in summer?
Keep reading
Related guides
Keep going
More in this topic: Heating, Cooling and Fresh Air
See all 12 steps of building a custom home, with every guide on the site | Straight answers: hours, payments, warranty, where we build
Pick the path that matches where you are
Heat and cooling are easiest to get right on paper. Start with whichever step fits. Or call 705-533-1633, Monday to Friday 8 to 5 (weekends by appointment).