Barrie ADU Calculator & Guide

Accessory Dwelling Unit (ARU) Eligibility, Regulations & Cost Estimator

Based on Zoning By-law 2009-141 (as amended by By-law 2024-043)

2026 Fee Reduction Active!

Building permit fees for ARUs are reduced by 50% in 2026. Plus, full rebates available if occupancy achieved within 12 months!

Property Details

Check your property tax bill or contact Service Barrie to confirm
Minimum typically 370-450 m² depending on zone
Gross Floor Area of existing main dwelling
Maximum typically 75 m² or 45% of main dwelling GFA
Maximum 4 units total per lot (By-law 2024-043)

Results

Enter your property details to see results

The calculator will check zoning eligibility, maximum ADU size, setbacks, and estimate costs.

Key Regulations Summary (By-law 2024-043)

  • Maximum Units: Up to 4 dwelling units per lot (main + 3 ARUs)
  • Maximum ADU Size: Smaller of 75 m² (807 sq ft) OR 45% of main dwelling GFA
  • Setbacks: 1.2m from side/rear lot lines; 4.0m from other residential buildings
  • Height: Maximum 4.5m (14.8 ft), must not exceed main dwelling height
  • Parking: 1 space per dwelling unit (tandem permitted)
  • Pathway: 1.2m unobstructed path to entrance required

Step-by-Step Process to Build an ADU in Barrie

1

Confirm Zoning & Eligibility

Verify your property zoning using the City's zoning map or contact Service Barrie. Check that your lot allows ARUs (permitted in R1, R2, R4, R5, RM1, RM1-SS, RM2, RM2-TH, RM3 zones).

2

Pre-Application Consultation (Optional but Recommended)

Contact Planneroftheday@barrie.ca to discuss your proposal. This helps identify potential issues early. Consider using the City's standardized ARU designs to streamline the process and reduce costs.

3

Prepare Your Application

Gather required documents: site plan, floor plans, elevations, construction details. If using a custom design, hire a design professional. For standardized designs, purchase full plans from the designer and add your site plan.

4

Submit Building Permit Application via APLI

Apply online at barrie.ca/APLI. Upload all drawings and documents. Pay permit fees (50% reduced in 2026 for ARUs). Fast Track option available for complete applications - reviewed within 5 business days.

5

Plan Review & Approval

Building Services reviews for compliance with Ontario Building Code, zoning, and applicable law. Planning Services reviews for zoning compliance. Address any deficiencies promptly. Typical review time: 3-10 business days for Fast Track.

6

Receive Permit & Begin Construction

Once approved, print your permit from APLI. Post permit on site. Schedule pre-construction inspection to confirm required inspection stages.

7

Complete Construction & Inspections

Typical inspections include: footings/foundation, framing, plumbing, HVAC, insulation, fire separations, final interior, final exterior. Call before you dig: 1-800-400-2255.

8

Final Inspection & Occupancy

Schedule final inspection. Upon passing, receive confirmation of occupancy. Apply for fee rebate within 12 months of permit issuance if occupancy achieved.

9

Register Your Second Suite (if applicable)

Contact Service Barrie at 705-726-4242 or Service.Barrie@barrie.ca to register. Registration ensures fire services, garbage collection, and proper addressing.

Timeline Estimate: Design & planning (1-2 months) → Permitting (2-4 weeks with Fast Track) → Construction (4-6 months) → Final inspection (2-4 weeks). Total: 6-10 months.

Zoning Zones Allowing ADUs in Barrie

Zone Permitted ADU Type Max Units/Lot Key Restrictions
R1
Residential First Density
Attached & Detached ARUs Up to 4 total Must have municipal street frontage; 1 parking space/unit
R2
Residential Second Density
Attached & Detached ARUs Up to 4 total Must have municipal street frontage; 1 parking space/unit
R3
Residential Third Density
Check specific provisions Varies May have special provisions (SP) applying
R4
Residential Fourth Density
Attached & Detached ARUs Up to 4 total Must have municipal street frontage; 1 parking space/unit
R5
Neighbourhood Residential
Attached & Detached ARUs Up to 4 total 1.2m side/rear setbacks; max 4.5m height
RM1 / RM1-SS
Multiple Residential First
Attached & Detached ARUs Up to 4 total Subject to RM1 standards for main building
RM2 / RM2-TH
Multiple Residential Second
Attached & Detached ARUs Up to 4 total Townhouse developments may have specific requirements
RM3
Neighbourhood Multiple
Attached & Detached ARUs Up to 4 total Minimum 4 attached dwelling units required for main building

Key Dimensional Standards (Section 5.2.9)

Maximum ADU Size Lesser of 75 m² OR 45% of main dwelling GFA
Side Yard Setback 1.2 meters minimum
Rear Yard Setback 1.2 meters minimum
Building Separation 4.0 meters from other residential buildings (O.Reg. 462/24)
Maximum Height 4.5 meters (14.8 ft); must not exceed main dwelling height
Lot Coverage Minimum 45% permitted (O.Reg. 462/24)
Pathway Width 1.2 meters unobstructed to entrance
Important: By-law 2024-043 (April 17, 2024) amended the Zoning By-law to permit up to 4 dwelling units on residentially zoned lands. Existing lots and principal buildings are exempt from current zoning standards when adding ARUs (except parking requirements).

Fees & Costs for ADUs in Barrie (2026)

2026 Fee Reduction Program Active!

Building permit fees for Additional Residential Units are reduced by 50%

Estimated Permit Fees

Building Permit Fee (Residential New/Addition) $42.45 per dwelling unit (50% off)
Planning/Zoning Review Fee $42.45 per unit (50% off)
Minimum Permit Fee (Part 9 Residential) $171.00 (50% off $342)
Two-Unit Registration (if applicable) $84.97/hour (min 0.5 hrs)
Compliance Letter (optional) $101.55
Estimated Total Permit Costs $260 - $400
Rebate Opportunity: Full refund of building permit fees if occupancy (final interior inspection) is achieved within 12 months of permit issuance!

Total Project Cost Estimate

Including construction, permits, and professional fees

$150,000 - $350,000+

Cost Breakdown

  • Design/Plans: $2,000 - $8,000
    Lower end if using standardized designs
  • Permits & Fees: $260 - $1,000
    Includes building, zoning, possible DCs
  • Site Preparation: $5,000 - $15,000
    Excavation, grading, utilities
  • Foundation: $15,000 - $30,000
    Slab, basement, or crawl space
  • Construction: $100,000 - $250,000
    Varies by size and finishes
  • Utilities/Hookups: $5,000 - $15,000
    Electrical, plumbing, HVAC
  • Contingency (10-15%): Recommended

Money-Saving Tips

Use Standardized Designs
City-approved ARU designs significantly reduce plan preparation costs and review time.
2026 Fee Waiver
Build now to save 50% on permit fees and potentially get full rebate.
Fast Track Application
Submit complete applications Monday-Thursday for 5-day review (vs. standard 3 weeks).
Development Charges
ARUs may be exempt from Development Charges depending on type and timing. Verify with City.

Key Contacts & Resources

Service Barrie

Phone: 705-726-4242

Email: Service.Barrie@barrie.ca

Hours: Monday-Friday, 8:30am-4:30pm

For: General inquiries, second suite registration, status updates

Planning Services

Email: Planneroftheday@barrie.ca

For: Zoning confirmations, pre-application consultations, planning compliance

Building Services

Portal: barrie.ca/APLI

For: Building permits, inspections, code compliance, permit status

Barrie Fire & Emergency Service

For: Fire safety inspections, smoke alarm requirements, emergency access compliance

Registration ensures fire services know your unit exists for emergency response.

Electrical Safety Authority (ESA)

Phone: 1-877-372-7233

Website: esasafe.com

For: Electrical permits and inspections (separate from building permit)

Lake Simcoe Region Conservation Authority

For: Properties near Kempenfelt Bay, waterways, or environmentally sensitive areas

May require additional permits for construction near watercourses or steep slopes.

Essential Online Resources

Before You Dig: Always call Ontario One Call at 1-800-400-2255 or visit on1call.com to locate underground utilities before excavation.
How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home