Here is what building a home with us actually looks like.
Most builders show you finished photos. We will show you the steps in between. Six stages, plain English, no surprises. If after reading you want to talk, the form and buttons are below.
First, let us figure out what kind of project you actually have.
Most homeowners ask for "a quote." A useful quote depends on the stage of the project. A full custom home, an ICF foundation, a rural lot with septic issues, a garage build, and a homeowner acting as their own GC all need different next steps.
The goal is to sort that out early, before you spend money designing something that does not match the site, the budget, or the permit path. Common sense is cheaper than rework.
How we build, step by step.
Six stages from the first phone call to handing you the keys. No mystery, no "we will circle back" forever.
First Call
We figure out if it is even a fit.
Fifteen to twenty minutes on the phone. We confirm the location, the project type, the rough timeline, and a budget range. By the end of the call, we will both know if it makes sense to keep talking.
If your project is way outside our area or budget, we will tell you on this call. No follow-up sales calls. No "we will get back to you."
Information Review
You send what you have. We read it properly.
Plans, sketches, surveys, septic reports, photos of the lot, your Pinterest board, a napkin drawing. Whatever you have. The more information you can share, the more useful the next conversation will be.
If your project has no drawings yet, that is fine. We can guide you on what to gather first and which design path makes sense for your site.
Budget Range & Cost Drivers
A real number, with the reasons behind it.
We give you a practical range, not a fairytale low-end number to win the job. More importantly, we tell you what is driving that number: the site, the size, the finishes, the mechanical decisions, the things that could push it up or down.
This is where we flag the issues that usually blow up custom home budgets. Better to know now than during framing.
Design & Planning
We keep the project buildable.
Whether you bring your own architect, use one of ours, or want us to handle the whole design phase, we stay involved. ICF wall thicknesses, mechanical space, radiant floor planning, sitework, structure, finish coordination. The details that make a home actually work.
Construction
Lot to keys. One phone number.
Site prep, foundation, ICF walls, structure, roof, mechanical, insulation, finishes, our in-house cabinetry and stairs. Our team handles it. You do not chase fifteen different subcontractors.
A custom home of this scale typically takes six to eight months of actual construction. Add design and permit time on top, and the full project usually runs fourteen to eighteen months from the day you call us.
Handover
You move in. We do not disappear.
Walkthrough, deficiency list, close-out, Tarion paperwork. The home is covered by a seven-year structural warranty. Beyond that, we are a half-hour drive away. If something needs attention, we are not hard to find.
Most of our calls after handover are not about problems. They are about additions, workshops, family-member referrals, or "do you have time for another one?"
What we build.
Projects where structure, comfort, site conditions, and long-term performance matter. The parts you cannot decorate your way out of later.
Custom ICF homes
High-performance custom homes built for Ontario weather. Quiet interiors, strong walls, lower heating bills, and the kind of comfort you notice on day one and on year fifteen.
ICF foundations & shells
Basements, crawlspaces, slab-edge details, frost walls. For owner-builders, designers, or homeowners who need an experienced ICF crew without taking on the whole build.
Radiant floor heating
Hydronic radiant systems we have been installing since 1991. Designed properly from day one, coordinated with the mechanical room, comfortable in February without running flat out.
Garages, workshops & additions
Detached garages, heated slabs, workshops, garage suites, and additions where the foundation, drainage, insulation, and mechanical planning still matter.
Rural & Georgian Bay builds
Waterfront, slope, septic, wells, conservation review, lot clearing. Rural building has its own rules, and we have spent forty years learning them.
Custom woodwork & interiors
Cabinetry, stairs, built-ins, post-and-beam, trim. Made in our own woodshop on our CNC, not catalogue-ordered. Real wood, real craftsmanship.
Why we are different from most builders.
Most builders are coordinators. There is nothing wrong with that, but when a project has sitework, ICF, radiant heat, custom cabinetry, and detailed finishes, it helps when the builder can actually solve things in-house.
You deal with the builder, not a layer of staff. We take on three custom builds a year, so your call goes to the person actually responsible for your home — 705-533-1633 — and you always know what is happening now and what decision comes next.
Check us the way you would check anyone. We published the full vetting process we would use on ourselves — licence lookup, the eight questions that matter, contract red flags: how to vet a custom home builder in Ontario. Run every check on us, then walk through the show home.
The same crew, twenty years running
Four experienced construction workers on payroll who have been with us for twenty-plus years. A crew that knows each other solves problems faster. Fewer "who did this?" moments. Fewer rework days. It shows in the finished home.
We do the sitework ourselves
Lot clearing, tree removal, access, drainage, excavation. We own the machinery and we know what to do with it. On rural Ontario projects, getting the site ready can make or break the budget. Better to do it once, properly.
Our own portable sawmill
When the property gives us usable timber, we can mill it on site. Posts, beams, custom details. Most builders cannot do this. Most owners do not realize it is even possible.
Complete woodshop with CNC
Cabinets, stairs, built-ins, trim, custom millwork. Made in our shop, not bought from a catalogue or subbed out to whoever was cheapest that week. That is the difference between a home that feels custom and a home that feels assembled.
A quick word about price.
This is the part everyone thinks about and nobody wants to say out loud. So we will say it.
We are usually not the cheapest quote. We are also usually not quoting the same thing as the cheapest quote.
A proper custom home estimate has to account for sitework, foundation realities, drainage, waterproofing, mechanical planning, realistic allowances, project management, and the boring details that prevent expensive surprises later. The cheapest number often comes from the builder who has not yet included the whole job.
If another quote comes in lower, the first question should not be "why are you more expensive?" The better question is: "Are both quotes actually including the same work?"
Construction has a way of collecting unpaid bills eventually. We would rather price the job honestly up front than discover the missing work in October.
Let us talk.
Tell us about your project below, or pick one of the more specific options to the right.
Free Estimates
Or pick a specific path
Already know what you need? Skip the general form and head straight to the right starting point.
Send Plans for Review
Have drawings? We will review feasibility and budget.
Ballpark Estimate
No plans yet? Tell us the size and we will reply with a range.
Book a Call
Fifteen minutes. We will tell you honestly if we are a fit.
Show Home Visit
Walk through a finished ICF home. The best 30 minutes you will spend.
Common questions.
The ones we hear most often from homeowners and owner-builders trying to figure out what step comes next.
No. Many homeowners start with an ICF foundation only and frame the rest in conventional wood. Others go full ICF top to bottom. The right answer depends on the design, the budget, the comfort goals, and the site conditions.
We can explain the tradeoffs honestly on a call. ICF foundations alone make sense in almost every project we do. Full ICF makes sense when comfort, quiet, and long-term performance are high on the list.
We can give you an honest range, not a contract price. A proper construction estimate needs proper information. If your drawings are incomplete, we will tell you what is missing and what the next step is.
Better to know your budget is realistic before you spend money on drawings than to find out after.
Because they often do not include the same work. Sitework, septic, drainage, foundation details, allowances, mechanical systems, excavation, finishes, cabinetry, project management. All of these can be included, excluded, guessed at, or hidden in vague language.
If you are comparing quotes, ask each builder for a written line-item scope. The differences usually become obvious.
For most ICF homes, yes. Radiant works beautifully in an ICF shell because the walls hold heat evenly. We have been installing radiant since 1991, in nearly every home we have built.
The value depends on proper design and zoning. A radiant system installed badly is no better than baseboards. A radiant system designed and installed properly is one of the most comfortable heating systems you will ever live with.
Yes, and we strongly recommend a site review before you commit to a layout. Rural and Georgian Bay properties involve tree clearing, driveway access, septic feasibility, well location, slope, drainage, conservation rules, and frost depth. Any one of those can change the entire plan.
We handle the sitework in-house through our sister company GeorgianBaySiteworks.ca.
Yes, selectively. We can help owner-builders with ICF foundations, plan reviews, sequencing advice, and avoiding the bigger traps. We are not the cheapest answer, but we can prevent expensive mistakes.
For owner-builders, the first conversation is usually about whether you actually want to do this. Acting as your own GC is real work. We can be honest about what you are signing up for.
Realistic timeline for a typical custom ICF home in our area: six to eight months of construction for a standard custom home, eight to twelve months for larger or more complex builds.
Design and permits typically add another four to ten months on top, depending on the municipality and whether you need conservation authority sign-off. So the full timeline from the day you call us to the day you move in is usually fourteen to eighteen months for a clean project.
If a builder promises six months from contract to move-in, ask hard questions. The shortcuts that make that happen show up in the finished home.
If you have drawings, send them through Send Plans for Review. If you do not have drawings yet, book a call. If you want a realistic budget range before going further, use the Ballpark Estimate Request.
Or use the form above. Whichever feels most natural for where you are right now.
Where we build.
Custom homes within a 90-minute drive of Tiny Township. That is how we keep quality high, schedules on track, and our team home for dinner. Outside the area? Contact us anyway. We will point you to someone we trust.
Tiny | Tay | Midland | Penetanguishene | Wasaga Beach | Collingwood | Blue Mountain | Barrie | Orillia
Free book
How to Build a Home Without Going Broke
Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.
Keep going
More in this topic: The Building Process
See all 12 steps of building a custom home, with every guide on the site | Straight answers: hours, payments, warranty, where we build

