Custom Home Builder in Tiny Township · Georgian Bay · ICF since 1995

Custom home builder in Tiny Township

Energy-efficient custom homes across Tiny — serviced lots, sandy inland parcels, and Georgian Bay shoreline. This is our home base.

Super-insulated ICF walls, radiant floors, and one crew from your raw lot to the finished house. More than 45 years building; ICF on every home since 1995; roughly 42 homes right here in Tiny. We know the septic, wells, shoreline and SSEA rules cold — because we live and build here.

45+ yearsBuilding in Ontario
~42 homesBuilt right here in Tiny
Since 1995ICF on every home
LocalBased in Tiny Township
Local knowledge

Why building in Tiny Township is different

Tiny lots aren't serviced city subdivisions. Get these right and the build goes smoothly; miss them and the budget blows up. The local realities that actually drive a Tiny build:

Septic, not sewers

Nearly every Tiny property is on a private septic system, permitted through the Simcoe Muskoka District Health Unit. Soil and lot size dictate the system — and the cost.

Wells & water

Most homes draw from a drilled well, with setbacks from the septic that have to be planned at the start, not patched in later.

Shoreline & the SSEA

Near Georgian Bay, the Severn Sound Environmental Association reviews shoreline development. North Simcoe has no conservation authority, so it's MNRF rules, the Township of Tiny, and SSEA guidance together — paperwork we handle every year.

Sandy soils & Bay wind

Foundations and the building envelope have to suit the ground and the weather coming off open water. ICF's reinforced, well-drained walls are built for exactly this.

One accountable team

One builder, from your Tiny lot to the keys

No juggling a GC, a separate excavator, and a cabinet shop that's never met each other. We run the whole build in-house — which is how it stays on schedule and on budget.

Design, engineering & permits

Drawings, structural engineering, SSEA review, septic and well permitting and the Township of Tiny building permit — coordinated as one package.

Site work — in-house

Clearing, excavation, driveways and grading through our own site-work crew, so the foundation stage isn't waiting on an outside sub.

The ICF shell + radiant floors

Super-insulated ICF envelope and in-floor radiant heating — the combination Georgian Bay winters are made for.

Finishes & our own millwork

Kitchens, vanities, stairs and built-ins from our in-house CNC shop — one team from drawings through installation.

Real numbers

What it costs to build in Tiny

A properly built custom home in Tiny generally starts around $1 million turnkey, with most landing between $1.2 and $2.5 million depending on size, lot and finish level. In 50 years, will this house still be performing the way you bought it for? On a Tiny lot — sandy soil, Bay wind, real winters — that question is what should drive the build.

Entry point — turnkey customfrom ~$1M
Most Tiny-area builds land at$1.2M–$2.5M
Drivers: size, lot, shoreline, septic, finishvaries

Planning a build in Tiny? Read what most quotes leave out.

How to Build a Home Without Going Broke covers the budget-killers people discover too late — the lot and site work nobody quotes, vague allowances, and how to compare builders honestly. Free PDF, straight to your inbox.

Common questions

Questions Tiny homeowners ask

Who approves my septic system in Tiny?
The Simcoe Muskoka District Health Unit. We size, permit and install the septic system as part of the build, matched to your soil and lot.
Can you build on a Georgian Bay shoreline lot?
Yes — shoreline lots need SSEA review and careful siting, and we've done it many times. See our waterfront builder in Tiny page.
Can you turn my cottage into a four-season home?
Often yes, depending on the existing structure. Send us what you have and we'll tell you straight whether it's worth converting or rebuilding.
How long does a custom build take?
Usually 14–18 months from first call to move-in for a clean project; add a few months for shoreline or septic complexity. See how long a custom home takes.
Why do your homes heat so cheaply?
Super-insulated ICF walls plus in-floor radiant heat. Our Tiny show home's documented Enbridge bill came in around $117.45 in the coldest month — that's a demonstration home, so your real bill depends on the size of the home and how you live in it, but it shows what the envelope can do.
Are you really local to Tiny?
Yes — we're based right here in Tiny Township and have built roughly 42 homes in the township. When you call, you're talking to the builder who lives and works in the area.

Let's talk about your Tiny build

Inland lot or Georgian Bay shoreline — get straight answers on budget, timeline, septic, wells and the SSEA before you spend a dime on the wrong thing. Send your plans or just your lot address and we'll come back with a real starting point. We're right here in Tiny. Call 705-533-1633 or email info@icfhome.ca.

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home