Part of: ICF Homes in Ontario

Living with ICF

Hanging Cabinets and TVs on ICF Walls (Plus Wiring)

Light things screw into the plastic strips buried in the foam. Heavy things go into the concrete or onto plywood backing. Wires and small pipes run in channels cut into the foam before drywall.

If you are building ICF, or just moved into one, this is the practical stuff nobody tells you: where the “studs” are, what holds a big TV or a wall of upper cabinets, how electricians and plumbers work in foam, and the mistakes I see after move-in.

Short answer

THE WEBS ARE YOUR STUDS

An ICF block is two foam panels held together by plastic webs. Each web ends in a flat plastic strip just under the foam face, running top to bottom like a skinny stud. Once the wall is poured, those strips are where drywall screws and light fasteners bite.

On Nudura forms, for example, the strips run vertically every 8 inches and are marked on the block face. Other brands use their own spacing, so ask your builder which forms are in your walls. Find one strip, measure 8 inches, and you will hit the next one.

How to find them after drywall

  • Your stud finder will not work. It is looking for wood.
  • Use a strong magnet. Slide it along the wall until it grabs a drywall screw head. That screw is in a strip.
  • Measure from an inside corner, then confirm with a small test screw where nobody will see it.
  • Advanced wall scanners can pick up the density difference between plastic and foam.

Pictures, mirrors, curtain rods, light shelving: a screw through the drywall into a strip is plenty. A screw into foam alone holds much less, so do not count on it.

Bottom line: Strips for light loads, concrete for heavy loads, and plan the heavy spots before the drywall goes up.

Heavy loads

Cabinets, TVs and Heavy Loads: Backing and Concrete Anchors

Upper kitchen cabinets full of dishes, a 75-inch TV on a swing arm, a handrail, a grab bar, a floating vanity. These want more than a plastic strip. You have two good options.

1. Anchor into the concrete

Drill through the drywall and foam and fasten into the concrete core with concrete screws or anchors rated for the load. The fastener has to be long enough to cross the full foam thickness and still get proper embedment in concrete.

2. Plywood backing

Before drywall, the foam face is raked back with a hot knife to the plywood thickness and plywood is screwed to several strips. The load spreads across many fasteners and you can screw anywhere on it later.

3. Both

For a big TV mount or a run of upper cabinets, plywood backing tied to the strips and anchored to the concrete is belt and suspenders. It costs little before drywall.

The real trick is timing. Backing is cheap when the walls are bare foam and a nuisance after paint. Before drywall, walk the house with your builder and mark every cabinet, TV, grab bar and heavy shelf location. We would rather put in plywood you never use than have you drilling blind later. Our custom kitchen cabinets and built-ins are laid out at that stage for exactly this reason.

For a TV, follow the mount maker’s instructions for masonry or concrete, and use anchors with a published rating for the weight plus the leverage of an arm. If the instructions only talk about wood studs, ask the maker what they recommend for concrete.

Wiring

How Electricians Run Wire in Foam

This is the part people expect to be hard, and it is not. After the concrete cures, the electrician cuts a narrow channel, called a chase, into the foam face with a hot knife or a small chainsaw-style tool. The cable goes into the chase and is pushed back into the foam. Nudura’s guidance is at least 1-1/2 inches deep, so drywall screws cannot reach it.

  • Boxes are usually screwed to the side of a web strip, snug against the concrete. Where there is no strip, there are ICF boxes with prongs that grip the foam.
  • Conduit is more common in commercial work, but it can be fastened to the concrete inside the foam.
  • Exterior lights, outlets and service entry need sleeves or planned paths through the concrete, so these get laid out before the pour.
  • Low-voltage wiring, speakers and network cable run the same way.

In Ontario, anyone you hire to do electrical work must, by law, be a Licensed Electrical Contractor. They file a notification with the Electrical Safety Authority and the wiring is inspected before it is covered. ICF does not change any of that. It just means the electrician has a hot knife in the truck.

Plumbing

Plumbing on Exterior Walls, and Why We Avoid It

In any Ontario house I keep water supply lines out of exterior walls. A frozen pipe in February does not care what the wall is made of. An ICF wall keeps the inside face warm, but the pipe is still sitting in foam against concrete that runs to the outside, and the fix is expensive.

So we put sinks, showers and toilets on interior walls where we can, or we build a framed wet wall in front of the ICF. When something has to be on an outside wall:

  • Small drain and vent pipes can run in the foam behind the drywall.
  • Pipes too big for the foam need the wall furred out with framing.
  • Pipes can be strapped to the plastic strips, just like strapping to studs.

Plumbing layout is far easier to settle on paper. If a kitchen sink under a window on an outside wall is non-negotiable, tell us early and we will plan the wall for it.

Finishing

Drywall, Trim and Baseboard Attachment

Drywall is screwed straight to the strips with coarse-thread screws. There is no strapping or framing on the inside face. For reference, Nudura’s fire-rated wall listing calls for 1/2-inch gypsum board fastened to the web flanges with screws at least 2 inches long. Drywall is not optional in an ICF house: the code requires the foam to be covered on the inside, which we explain on our ICF fire and pest myths page.

Trim is easy because the strips are close together. Baseboard and casing are fastened into the strips, usually with construction adhesive plus finish nails or trim screws. Window and door casings fasten to the bucks around each opening, which are solid. Stair stringers and railings that land on an ICF wall need the same backing or concrete anchoring as cabinets, which matters for custom stairs.

One bonus: with concrete behind the drywall, ICF walls feel solid when you knock on them and they are quiet. Our soundproofing and ICF home comfort pages cover why.

After move-in

Mistakes We See After Move-In

  1. Hunting for studs with a stud finder. Use a magnet and a tape measure.
  2. Hollow-wall anchors for heavy things. A toggle in drywall over foam is not holding a loaded shelf. Go to the concrete.
  3. Drilling without knowing where the wires are. The wires are in the foam, close to the surface. Drilling for an anchor can hit one. Take photos of every wall before drywall, with a tape measure in the shot, and keep them.
  4. Short anchors. An anchor that ends in the foam is not in the concrete. Measure the foam thickness first.
  5. DIY electrical chases with a grinder. Leave it to the electrician and ESA.
  6. Changing the kitchen after drywall. Moving upper cabinets six feet means new backing or new concrete anchors. Settle the layout before drywall.

Want to see and knock on finished ICF walls? Book a showhome tour. For more everyday questions, see insulated concrete forms questions, how the brands differ in Nudura vs Logix vs Fox Blocks, or go back to the ICF Homes in Ontario guide.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Questions people ask

FAQ

Where are the studs in an ICF wall?
There are no wood studs. Plastic webs inside the block end in flat strips just under the foam face, running top to bottom. On Nudura forms they are every 8 inches. Find them with a magnet on the drywall screw heads, not a stud finder.
Can you mount a big TV on an ICF wall?
Yes. Fasten the mount through the drywall and foam into the concrete with anchors rated for the load, or onto plywood backing installed before drywall. Make sure the anchors are long enough to cross the foam and embed properly in concrete.
How do you hang kitchen cabinets on ICF walls?
Plan the cabinet locations before drywall so plywood backing can be set into the foam and screwed to the plastic strips, or fasten the cabinets into the concrete with concrete anchors. Do not rely on drywall anchors over foam.
How is electrical wire run in an ICF wall?
After the concrete cures, the electrician cuts a narrow chase in the foam with a hot knife, lays the cable in and pushes it back into the foam. Boxes are screwed to the plastic webs or held by ICF boxes that grip the foam. A Licensed Electrical Contractor files with ESA and the work is inspected before drywall.
Can plumbing go in an ICF exterior wall?
Small drain and vent pipes can run in the foam, and larger pipes need the wall furred out. We keep water supply lines off exterior walls in any Ontario house to avoid freezing, and plan wet walls on the inside where we can.
Does drywall attach directly to ICF?
Yes. Drywall is screwed straight to the plastic strips in the foam with coarse-thread screws, with no strapping needed. The drywall also serves as the covering the building code requires over the foam on the inside.

Keep going

More in this topic: ICF Facts and Myths

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home