ICF Homes: Insurance, Appraisal and Resale in Ontario

An ICF house is a normal house to a bank, an insurer and a buyer. That is mostly good news. The catch is that none of them will give you credit for what is inside the walls unless you hand them the proof.

I will not promise you a cheaper premium or a resale bonus, because nobody can. What I can tell you is how appraisers, brokers and buyers look at an ICF house, what to ask each of them, and which papers to keep so the house gets judged on what it really is.

Short answer

THE APPRAISER DOES NOT KNOW WHAT ICF IS. Hand Them the Proof.

Appraisers mostly value a house by comparing it to recent sales nearby. In rural Simcoe County there may be no recent ICF sale to compare against. So the appraiser sees a 2,000 square foot bungalow on two acres and looks at other 2,000 square foot bungalows on two acres. The walls are a line on a form.

You cannot change how appraisal works, but you can make the appraiser’s job easier. Give them a short, tidy package:

  • The plans and a one-page spec sheet: wall system, foam thickness, windows, heating, ventilation.
  • The energy rating or energy model, if you have one.
  • The heat loss and heating design.
  • The builder contract and the Tarion enrolment for a new home.

In the US, the Appraisal Institute publishes a green and energy-efficient addendum that lets appraisers record these features. Ask your appraiser whether they use anything similar. Some will, some will not. Either way, a paper trail beats a sales pitch.

Bottom line: Expect an ICF house to be valued mostly like its neighbours. Paperwork helps the appraiser notice what is different, but do not build ICF expecting the bank to pay you back for the walls.

During the build

Construction Draws and Appraised Value on a Custom Build

With a construction mortgage, the bank does not hand over the money at once. It releases draws as stages are finished, and each stage is inspected before the next draw. One sample schedule from NerdWallet Canada releases 15, 25, 25, 20 and 15 percent at roughly foundation, roof on, mechanicals and drywall, finishes, and move-in. Every lender sets its own schedule.

Two things matter for an ICF house:

  1. ICF front-loads the cost. Foundation and walls are a bigger share of the money on an ICF house than on a wood house. If the lender’s first draws are small, you may be carrying more cash early. Talk about this with the lender before you sign, not when the first big invoice lands. Our payment schedule on ICF foundation and wall work is 10 percent at signing, 40 percent when materials are delivered, 40 percent before the pour and a final 10 percent held back under the Construction Act, so you can line those dates up against your draws.
  2. The loan is based on value, not your cost. If the house appraises below what it costs to build, the difference comes out of your pocket. This is the same for any custom home, but it bites harder when you spend money on things an appraiser cannot see.

The full picture on draws, holdbacks and budget traps is in our construction mortgage guide, and the holdback itself is explained on our lien and holdback page.

Insurance

Insurance: What to Ask Your Broker

Home insurance in Canada is based on what it would cost to rebuild the house, not on what it would sell for. Size, layout, materials, finishes and local labour drive that number. Construction type can matter to some insurers and not to others.

Here is what I have seen in the industry chatter, and it is honest to call it mixed. Some insurers rate ICF like a concrete or masonry house. Some treat it as an unusual construction type, like a log or dome home, and are less keen. Nobody publishes an ICF discount, and I will not tell you there is one.

Ask two or three brokers these questions, in writing

  1. How do you class an insulated concrete form house? Masonry, concrete, frame, or other?
  2. Does that class change my premium, and by how much on this house?
  3. What replacement cost are you using, and does it reflect ICF walls and our finishes?
  4. Do I need course-of-construction or builder’s risk coverage while it is being built, and who carries it?
  5. Does the policy have an inflation guard so the rebuild cost keeps up?
  6. What paperwork do you want: the ESA Certificate of Acceptance, a roof certificate, the occupancy permit?

Give every broker the same spec sheet so you are comparing apples to apples. And tell them when you finish a basement or add on, because the rebuild cost changes.

Selling

Resale: How to Sell the Comfort and Energy Numbers

Most buyers walk into an ICF house and do not know it is ICF. What they notice is that it is quiet, there are no cold spots and the floors are warm. Your job when you sell is to turn that feeling into facts on paper.

Real bills

Twelve months of heating and hydro bills. Actual numbers from your house beat any brochure.

An energy rating

In Ontario, the EnerGuide label for houses shows energy use in gigajoules per year. A registered energy advisor produces it.

The warranty

Tarion coverage stays with the home for seven years from first possession, and later owners get the balance. That is a selling point on a young house.

Ask your agent to put “insulated concrete form construction” in the listing, attach the spec sheet and bills to the feature sheet, and let buyers knock on the walls. Agents who have never sold an ICF house sometimes skip it entirely. If you are weighing the whole build-or-buy question, our build vs buy calculator runs the numbers, and the benefits of ICF over traditional homes gives you the talking points.

Keep a folder

The Documents to Keep

Make one folder, paper or digital, on the day you move in. It helps with the appraiser, the insurer, the next buyer and you, the first time something needs fixing.

Document Who produces it Why it matters
Permit, inspection records and occupancy Township building department Proves the house was built and inspected to code
Stamped drawings and engineering Designer and engineer Needed for any future renovation or addition
Wall system spec (brand, foam, core) Builder Tells the appraiser, insurer and buyer what the walls are
Heat loss and heating design Heating designer Shows the system was sized for the house
Energy rating and airtightness test Registered energy advisor The one number buyers and lenders can compare
ESA Certificate of Acceptance Electrical Safety Authority Insurers and buyers ask for it
Tarion warranty papers Builder and Tarion Transfers the remaining coverage to a buyer
Septic and well records Installer, driller, township Every rural buyer and lender will ask
Photos of every wall before drywall You or the builder Shows where wires and pipes run

Our sister site OntarioHeatLoss.ca does room-by-room heat loss and heating design, and our heat loss calculation page explains why it matters.

One program worth knowing about: as of 2026, CMHC Eco Plus offers a 25 percent partial refund of the mortgage insurance premium if your mortgage is CMHC-insured and the newly built home has an eligible energy certificate or an EnerGuide rating at least 20 percent better than a typical new home. You apply within two years of closing. It only applies to CMHC-insured mortgages, so ask your lender first.

Straight talk

When ICF Does Not Add Resale Value

I build ICF and I still tell people when it will not pay at resale.

ICF tends to make sense when

  • You plan to live in the house a long time.
  • You care about comfort, quiet and low heating bills.
  • You are on an exposed lot where wind and cold hit hard.
  • You want a house that stays solid for decades.

Do not count on a payback when

  • You will sell in a few years.
  • The lot, the water or the view sets the price, not the house.
  • The house is already far above its neighbours in value.
  • Buyers in that market shop on price per square foot alone.

Build ICF because you want to live in it. If it also helps at resale, good. For the full cost and comfort trade-off, read ICF vs conventional, is it worth it in Ontario. Insurers also ask about fire, which we cover in ICF fire and pest myths. If you want certified energy programs explained, see our page on ENERGY STAR for new homes in Ontario. For the money side of the build, go back to the Construction Mortgages in Ontario guide.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Questions people ask

FAQ

Will an ICF home appraise for what it cost to build?
Not necessarily. Appraisers mostly compare a house to recent nearby sales, and there may be no ICF sales to compare against. Give the appraiser your plans, spec sheet and energy rating, but do not count on full credit for the walls.
Is home insurance cheaper on an ICF house in Ontario?
There is no published ICF discount. Insurance is based on rebuild cost, and insurers differ on how they class ICF construction. Ask two or three brokers how they class it and what it does to your premium, and get the answers in writing.
Is it hard to insure an ICF house?
Some insurers treat ICF like concrete or masonry construction and others see it as unusual. If one company hesitates, try a broker who can shop several insurers and give them a clear spec sheet for the wall system.
Does an ICF house sell for more?
Nobody can promise that. It helps when buyers can see real heating bills, an energy rating and a transferable warranty. It helps least when you sell within a few years or when the lot and view set the price.
What documents should I keep for an ICF house?
Keep the permit and inspection records, stamped drawings, the wall system spec, the heat loss design, any energy rating, the ESA Certificate of Acceptance, Tarion papers, septic and well records, and photos of every wall before drywall.
Does the Tarion warranty transfer if I sell?
Yes. Tarion says the warranty stays with the home for seven years from the original date of possession, and later owners get the balance of the coverage. New owners should contact Tarion after they take possession.

Keep going

More in this topic: Financing, Tax and Rebates

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home