Longer than a wood-frame house, but not forever. The concrete in an ICF wall holds heat and the foam keeps it in, so the temperature drifts down slowly instead of falling off a cliff. You still need a plan for the well, the septic pump and the boiler.
For people building on a rural lot or cottage property around Georgian Bay, where an ice storm can take the power out for days. What keeps working, what a generator needs to run, and the rules people skip.
Short answer
The Furnace Stops. The Concrete Keeps Going.
Let me set expectations first. When the power goes out, every heating system in your house stops. The boiler, the heat pump, the furnace fan, the circulator pumps on the radiant floor. Even a gas furnace needs electricity to run. So the question is not “will it stay warm,” it is “how fast does it cool off, and what do I do about it.”
In a wood-frame house the heat is mostly in the air, and air does not hold much. Open the door twice and it is gone. In an ICF house the inside face of every exterior wall is a few inches of concrete sitting inside foam, plus a concrete slab full of warm water pipes if you have radiant floors. All that mass is at room temperature when the lights go out, and it gives that heat back slowly. The foam on the outside slows the loss to the cold.
I will not give you a number of hours or days. Anyone who does without having tested your house is guessing. It depends on the weather, the glass, the airtightness, and how often the kids open the back door. What I can tell you is that a well-built ICF house loses heat slowly enough that you have time to act calmly instead of panicking at 3 a.m.
For a sense of the scale, our showhome is a super-insulated ICF house with radiant in-floor heat, and it costs about $100 a month to heat in the coldest part of winter. Nobody lives in it; it is a demonstration home. A house that needs that little heat to stay warm also loses it slowly when the heat stops. More on why on our ICF home comfort page and in ICF for extreme climates.
Backup power
Generators: Portable, Standby and the Transfer Switch
There are two kinds of people with generators. The ones who installed a proper transfer switch, and the ones running extension cords through a cracked-open window. The second group is the one the fire department gets to know.
Portable generator
Cheaper, and fine for a tight house if it is set up right. You need an inlet on the outside wall and a transfer switch or approved transfer device so you can power selected circuits: boiler, circulators, well pump, fridge, a few lights. ESA is blunt about where it goes: never run a generator inside your home or garage, and opening windows or running fans does not make it safe.
Standby generator
Permanently installed, usually on propane or natural gas, starts on its own. More money, less hassle, and the only sensible choice for a cottage that sits empty in February. It has to be sized for what it will actually run. A heat pump with a big start-up load is a very different job than a boiler and two small circulator pumps, so get the electrician and the mechanical designer talking before you buy.
The transfer switch and the paperwork
The transfer switch keeps generator power from flowing back up the hydro lines, where it can hurt a line worker. ESA says you must file a notification of work to connect a generator permanently to your home’s electrical system, and its 2026 bulletin on meter-base plug-in devices confirms a notification is needed to hardwire a generator to a transfer switch even when a licensed electrical contractor does the work. ESA strongly recommends hiring a licensed electrical contractor. Some utilities do not allow the meter-base plug-in type at all, so ask your utility before you buy one.
Building new? Rough in the inlet and transfer switch while the walls are open. It costs far less than cutting into a finished house later.
Heat with no power
Wood Stove or Propane Fireplace as Backup
A heat source that needs no electricity is the oldest backup there is. In a tight ICF house it needs more thought than it did in the old farmhouse, because a tight house does not leak in the air a fire wants.
- Wood stove. Most townships want a building permit for a wood stove inside a house. Norfolk County’s permit guide, for example, asks for the stove’s certification plate, proof of a WETT-certified installer, the clearances page from the manual, and a ventilation plan, citing the code requirement for an HRV so the house does not depressurize. Check your own township’s list.
- Combustion air. In a tight house we plan the air supply for the stove from day one. The stove maker’s manual and the building code decide what is required.
- Propane fireplace. Pick a direct-vent unit that can light and run without power. Many fireplaces need power for the fan or the ignition, so read the spec before you assume it will work in an outage.
Since January 1, 2026, Ontario requires carbon monoxide alarms on every level of a home that has a fuel-burning appliance, a fireplace or an attached garage, plus near sleeping areas. Battery-backed or battery-powered ones, please. A CO alarm that runs on house power alone is not much use in a blackout.
If you are still choosing the main system, start with our best heating for an ICF home guide. How a stove fits with a heat pump or a radiant boiler is a design question, not a store question.
Water and waste
Keeping the Well Pump and Septic Pump Alive
This is the part city people forget. On a rural lot, no power means no water. The well pump stops, and once the pressure tank is empty, no flushing, no washing, no cooking. If your septic system has a pump chamber, that pump stops too.
- Put the well pump on the generator panel. It is often the biggest motor in the house, so your electrician has to size the generator and transfer switch for it, not guess.
- Know what kind of septic you have. A gravity system keeps working without power. A system with a pump chamber has some storage, but it is not unlimited. Ask the installer how much reserve your chamber has and go easy on water until power is back.
- Keep the radiant circulators and the boiler on the generator. They draw little power and keep heat moving out of the slab.
- Store some water anyway. Public Safety Canada’s advice is to be ready to be self-sufficient for at least 72 hours. A few jugs in the basement cost nothing.
Planning a well or septic on a new lot? See well drilling costs in Simcoe County and our septic cost guide.
Cottages
Freeze Protection for an Empty Cottage
An outage when you are home is an inconvenience. An outage in January when you are in Florida is a flood. Water in pipes that freeze will split them, and you will not know until the thaw.
- A low-temperature alarm that texts you over cellular, not just Wi-Fi. The internet router dies with the power too.
- A standby generator with auto-start, serviced every year, with fuel in the tank.
- Plumbing kept inside the insulated envelope. No supply lines in outside walls or unheated crawlspaces. ICF helps here because the walls themselves are warm.
- A shut-off plan. If you leave for weeks, decide with your plumber whether to shut off and drain, or keep heat on.
- Somebody local with a key who will actually drive over.
More on four-season cottages in our waterfront and cottage homes guide.
Quiet backup
Batteries and Solar
Home batteries are a real option now, and they are quiet. A battery sized for essentials can carry the boiler, circulators, fridge and lights for a while, and longer if solar can top it up. It will not run a big heat pump through a long cold snap without a very large battery bank.
A plain grid-tied solar system shuts itself off when the grid goes down. That is deliberate, so it does not push power into lines that crews are working on. Solar panels only help in an outage if the system is designed with a battery and the right equipment to run your house on its own. Ask the installer, in writing.
If you want to go further, our off-grid page covers fully independent systems. For most of our clients the practical answer, and the one we cover in our heating hub, is a tight ICF house, a generator or battery for the essentials, and a heat source that needs no power.
Planning a rural build?
Tell me about the lot, the well and how you plan to heat. I will tell you what backup makes sense and what is a waste of money.
Free book
How to Build a Home Without Going Broke
Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.
Questions people ask
FAQ
How long will an ICF house stay warm without power?
Do I need a permit to hook up a generator?
Will my radiant floor heat work during an outage?
Can I put a wood stove in an airtight ICF house?
Will my solar panels keep the lights on in a blackout?
What do I need to keep running on a rural lot?
Keep reading
Related guides
Keep going
More in this topic: Heating, Cooling and Fresh Air
See all 12 steps of building a custom home, with every guide on the site | Straight answers: hours, payments, warranty, where we build
Pick the path that matches where you are
Building on a rural lot or a cottage property and want backup heat planned properly from the start? Or call 705-533-1633, Monday to Friday 8 to 5 (weekends by appointment).