The PDI and Final Walkthrough: Handling Deficiencies
The pre-delivery inspection, or PDI, is the walkthrough your builder must do with you before you take possession of a new Tarion-enrolled home. You go room by room, write down anything damaged, missing, incomplete or not working, and both of you sign. It is a record, not a warranty claim. The warranty forms come after you move in.
This is for people getting close to the keys who want to know what happens at the PDI, what to look for, how to write it up so it gets fixed, and how Tarion’s forms work after move-in.
Short answer
Write Down Everything, Sign It, Keep a Copy
Every new house has deficiencies. A scuffed baseboard, a door that rubs, a missing outlet cover. That is not a sign of a bad builder. A builder who will not write them down is.
The PDI is how the condition of the house gets recorded on the day you take it over. If a scratch on the counter is on the PDI form, nobody argues later about whether it happened during your move. If it is not, it gets harder.
So slow down, look at everything, and put it on paper. Plan on about an hour per 1,000 square feet. Tarion suggests the same.
The rules
What the Tarion PDI Is, and What It Is Not
If your custom home is built under contract on your own land and enrolled with Tarion, your builder is required to conduct a PDI with you or your designate. Here is what Tarion’s guidance says happens:
- Who attends. You, or someone you appoint. Your designate can be anyone, including a professional home inspector. You fill in Tarion’s Appointment of Designate form and give the builder a copy before or at the PDI.
- What gets recorded. Items that are incomplete, damaged, missing, inaccessible or not working properly, inside and outside.
- Systems walkthrough. The builder explains how the heating, electrical, plumbing and air conditioning work.
- Signatures. You and the builder both sign the PDI form, and you get a copy.
- The certificate. On the PDI date, the builder completes the Certificate of Completion and Possession, which records the date your warranty starts, and files it with Tarion within 15 days of possession.
What it is not: the PDI form is not a warranty claim. Tarion says so directly. Anything still unresolved after you move in goes on your first warranty form. Our Tarion warranty guide covers the coverage in detail.
The PDI is also not the township’s final inspection. The building inspector checks the house against the Code for occupancy. The PDI is between you and the builder. Our page on new home inspections in Ontario explains the inspector’s side.
Be ready
What to Bring and What to Check
Bring your contract, the drawings, your written selections and every signed change order. You are checking the house against what you paid for, not just against what looks nice. Bring a phone for photos, painter’s tape for marking spots, a flashlight, a plug-in outlet tester and a notebook.
| Area | What to check |
|---|---|
| Outside | Grading slopes away from the house, downspouts discharge away from the foundation, siding and trim complete, caulking at windows and doors, no damage to the driveway or lawn left unrecorded. |
| Windows and doors | Every one opens, closes and locks. Screens present. Glass not scratched. Exterior doors seal without daylight showing. |
| Plumbing | Run every tap hot and cold, flush every toilet, fill and drain tubs and sinks. Look under each sink for drips. Check hose bibs. |
| Heating, cooling and air | Each thermostat calls for heat and the zone responds. Radiant manifolds labelled. HRV or ERV running and the controls explained. See our HRV vs ERV guide. |
| Electrical | Every switch and outlet works, GFCI outlets trip and reset, panel directory labelled, exterior lights work. |
| Finishes | Drywall, paint, flooring, tile, trim, cabinets and counters. Look across walls with a flashlight held flat. Open every drawer. |
| Basement and mechanical room | Signs of water, sump pump operation if there is one, equipment manuals and warranty cards left on site. |
Selections matter here. If a model number differs from what you picked, write it down. Tarion’s one-year warranty covers unauthorized substitution of selected items, and our page on the selections schedule explains why a written record matters.
Write it right
How to Write a Deficiency That Actually Gets Fixed
A vague list gets a vague result. “Paint touch-ups” means something different to you than to the painter. Write each item so a trade who has never seen your house could walk in and find it.
- One item per line. Do not bundle three problems into one note.
- Say exactly where. “Main bath, wall behind the door, about 4 feet up,” not “bathroom wall.”
- Say what is wrong. Damaged, missing, incomplete or not working. Those are Tarion’s own categories.
- Say what fixed looks like. “Replace cracked tile,” not “tile issue.”
- Take a photo with a piece of painter’s tape on the spot, and number it to match the line.
Then agree on when each item will be done, and write that down too. If you find damage after the PDI that should have been caught, Tarion’s advice is simple: photograph it and email the builder right away.
After move-in
The 30-Day and Year-End Forms
Once you have the keys, register for Tarion’s MyHome portal. That is where you submit warranty forms. The windows are strict, so put the dates in your calendar on possession day.
| Form | When you can submit it | Notes |
|---|---|---|
| 30-Day Form | During the first 30 days of possession | One accepted. Put unresolved PDI items here. |
| Year-End Form | During the last 30 days of the first year | One accepted. Covers one-year warranty items. |
| Second-Year Form | Any time in the second year | More than one allowed. Two-year items like water through the basement walls or windows. |
| Major Structural Defect Form | After year two, up to year seven | For defects in load-bearing structure. |
Submitting a form on time starts a 120-day period for the builder to repair or resolve the items. If something is still outstanding after that, you have 30 days to ask Tarion for a conciliation, and the builder then gets 30 more days. Miss that window and Tarion says the items are withdrawn. Do not let a form expire because someone said “we will get to it.”
As of the May 2024 contract-home rules, Tarion coverage runs one year for workmanship and materials, two years for things like water penetration and the mechanical systems, and seven years for major structural defects, up to $400,000. Our own 7-year materials and workmanship warranty sits alongside that.
Money at the end
Holdback Is Not a Deficiency Fund
People mix these up all the time. Under Ontario’s Construction Act, the owner holds back 10% of what is paid as the work goes in. That money is there to protect you from liens if a trade or supplier does not get paid. Trades generally have 60 days to preserve a lien, counted from substantial performance, completion, abandonment or termination. It is not a pot of money for a door that sticks.
Deficiencies are handled separately, and how much can be held for them should be spelled out in your contract. A fair approach is a written deficiency list with a dollar value against each open item, released as each one is fixed. Our page on the lien holdback in Ontario and our guide to payment stages and change orders cover the money side.
Under the 2026 Construction Act changes, if you get an invoice you disagree with, object in writing within 7 days. I build houses, I do not practise law. Have a construction lawyer read the end-of-job clauses in your contract.
Our way
How We Handle the Walkthrough
We do the PDI with you, in person, and we do not rush it. You get a signed copy of the list the same day. Items get booked with the right trade, and we tell you when. If you want a home inspector there, bring one. A second set of eyes makes for a better list, and a better list makes our job easier too.
After that, you have Tarion’s coverage and our 7-year materials and workmanship warranty behind you. To see where handover fits in the whole build, from lot to keys, read the custom home building process.
Building soon and want to know how handover works?
Book a call and we will walk you through our process from contract to PDI, including how deficiencies are recorded and fixed.
Free book
How to Build a Home Without Going Broke
Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.
Questions people ask
FAQ
What is a PDI on a new home in Ontario?
Can I bring a home inspector to my PDI?
Is the PDI form a warranty claim?
When do I submit the 30-Day and Year-End forms?
How long does the builder have to fix warranty items?
Can I keep the holdback until deficiencies are fixed?
Keep reading
Related guides
Keep going
More in this topic: The Building Process
See all 12 steps of building a custom home, with every guide on the site | Straight answers: hours, payments, warranty, where we build