Need the design or the report itself?

Radiant floor design, room-by-room heat loss and loop layouts are done by our sister site, OntarioHeatLoss.ca. They do code-ready reports for permits, for homeowners, designers and builders.

Go to OntarioHeatLoss.ca Building the whole house with us? Get a ballpark.

Radiant Floor Heating

Radiant Floor Heating · Georgian Bay & Simcoe County

Warm floors, even heat, and a house that finally feels calm

Radiant heat delivers warmth where you actually live — at floor level — with no blasts of hot air and no dust blown around the house.

Done right, it's one of the most-loved things in a custom home. Done casually, it's an expensive disappointment. We design radiant as a complete system — envelope, heat source, tubing and controls together — so it feels like the room is quietly cheating.

Since 1991Designing radiant floors
Floor-level heatNo cold-feet / warm-head
No blown dustQuieter, cleaner air
Loves ICFStable, low-temp comfort
Start here

What radiant floor heating actually is

Hydronic radiant heating runs warm water through tubing in (or under) your floor. The whole floor becomes a gentle, low-temperature radiator, warming people and objects directly instead of pushing hot air toward the ceiling. That's why a radiant room feels even and quiet — the heat is where your feet are, and the system doesn't have to "blast" to keep up.

The catch: radiant isn't a "nice upgrade" you sprinkle on at the end. It's a full system. Tube spacing, water temperature, insulation under the heat, and controls all have to be planned together. That planning is the difference between radiant that feels incredible and radiant that never feels quite right.

Is it worth it?

We'll be honest about when radiant pays off

Radiant is worth it when…

  • You're building or renovating and can insulate properly under the heat
  • You want even, quiet comfort and better air quality
  • You're pairing it with a high-performance envelope (especially ICF)
  • You're planning an air-to-water heat pump as the heat source
  • You care about how the home feels, not just the spec sheet

Think twice when…

  • It's bolted onto a cold, under-insulated floor — you'll heat the structure, not the room
  • It's treated as a casual add-on with no system design
  • Nobody has planned water temperature and controls
  • You're chasing the lowest quote over a properly engineered system
Where radiant shines

Best-fit uses in a custom home

Bathrooms & ensuites

The classic "never cold tile" upgrade — the one people notice first and love most.

Garages & workshops

A heated slab you'll actually use in February — as long as it's insulated underneath (or you're heating the earth).

Whole-home in an ICF build

Slab-on-grade or suspended floors, designed around the home. This is where radiant + ICF is at its best.

The 2026 play

Radiant + an air-to-water heat pump

Modern high-performance homes don't need screaming-hot water — they need steady, low-temperature heat. That's exactly what an air-to-water heat pump delivers, distributed through your in-floor tubing. It's why radiant has shifted from "luxury add-on" to core system strategy.

Ontario rebates · 2026

The combo that unlocks the incentives

Radiant floors aren't usually a rebate line-item on their own — but they sit right beside upgrades that are. Ontario's Home Renovation Savings program lists rebates for heat pumps (up to $12,000) and smart thermostats. Pairing radiant with a heat pump is where homeowners win.

Radiant floor heating rough-in during an ICF build
What it really costs

No fantasy numbers — here's what drives the price

Radiant cost in Ontario depends far more on how it's designed than on a per-square-foot rule of thumb. Don't budget radiant by $/sq ft — it hides the decisions that actually matter.

Heat source

Boiler vs. air-to-water heat pump changes both the install and your running cost for the life of the home.

Insulation under the heat

Skimp here and you pay to heat the slab and the ground forever. Insulate properly and the system runs lean.

Floor assembly

Slab-on-grade is straightforward; suspended floors need careful tube spacing, plates and water-temp planning.

Controls & zoning

Good controls are what make radiant feel effortless — and what keep operating cost sane.

Home size & layout

Area, zoning and finish choices move the number more than any single "rate."

The envelope

A tighter, better-insulated home (like ICF) needs less heat — which shrinks the whole system.

Want a real ballpark for your build?

Skip the misleading per-square-foot math. Use the calculator, or send us your plans and we'll give you an honest number.

Why we build this way

Radiant likes stable. ICF likes stable.

ICF homes are tighter and more thermally stable when they're detailed properly — lower heat loss, steadier indoor temperatures, and no need for high-temperature blasts to claw comfort back. Radiant thrives in exactly that environment. Pair them correctly and you get a home that feels calm: warm, even, and quiet, without the furnace running like it's trying to win a race.

Lower heat lossStable temperaturesLow-temp comfortSmaller HVAC loads
Common questions

Radiant floor heating, answered honestly

Is radiant floor heating cheap to run?
Not automatically. Operating cost depends on your heat source, insulation level and control strategy — not the floor itself. Radiant over a well-insulated assembly with an efficient heat pump can be excellent; radiant over a cold, uninsulated slab is a money pit.
Does it work with a heat pump?
Yes — and that's the modern play. Air-to-water heat pumps make low-temperature hot water, which is exactly what radiant wants. It also lines you up for the heat-pump rebates worth the most in 2026.
Can I put radiant in just a few rooms?
Absolutely. Bathrooms and a heated garage slab are the two most-loved partial installs. Whole-home radiant is best planned from the start, especially in an ICF build.
What do builders get wrong with radiant?
Treating it as a casual add-on: no insulation under the heat, no water-temperature planning, wrong tube spacing, and weak controls. Radiant is a system — designed as one, it feels incredible; bolted on, it disappoints.
Slab-on-grade or suspended floor — does it matter?
Yes. Slab-on-grade is the most straightforward. Suspended floors (main floor over a basement) are very doable but design matters more — tube spacing, plates, insulation and water temperature all become critical.
Why not just use forced air?
Forced air works, but it heats the ceiling first, moves dust, and can feel like "cold feet, warm head." Radiant puts the warmth where people are and does it quietly. In a high-performance home, it's a noticeably nicer way to live.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Thinking about radiant in your build?

Let's design it as a complete system from the start — envelope, heat source, tubing and controls together — so it feels right on the coldest day of the year.

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home