SB-12 Explained: Ontario’s Energy Code for New Homes

SB-12 is the part of the Ontario Building Code that sets how energy efficient a new house has to be. You prove it on a form that goes in with your permit. An ICF envelope makes the wall part of that form easy.

For people about to apply for a building permit, or wondering what their designer means by “the package.” The three ways to comply, where ICF walls fit, the paperwork, and when it makes sense to go past the minimum.

Short answer

The Code Minimum Is the Worst House You Are Allowed to Build

I say this to every client, and I mean it kindly. Code is a floor, not a target. A house that just squeaks past SB-12 is legal. It is not necessarily comfortable, quiet or cheap to heat.

Now the facts. Ontario’s 2024 Building Code came into effect on January 1, 2025, and since April 1, 2025 all new permit applications are reviewed under it. For energy efficiency in houses, Ontario did not adopt the new national tiered approach. The HCRA’s summary of the update says SB-12 remains in place. So the rules your designer is working to are SB-12, Energy Efficiency for Housing, as referenced by the 2024 code.

SB-12 does three jobs. It sets the minimum insulation, windows, mechanical equipment and air sealing for a new house. It gives you more than one way to prove you met it. And it gives the building department a standard way to check.

Bottom line: Every new full-time house in Ontario has to show SB-12 compliance at permit. Your designer picks a path, fills in the summary form, and the house has to be built the way the form says. Changing windows or the furnace later can change your compliance.

Three ways to comply

Prescriptive Packages vs the Performance Path

SB-12 gives three routes. The Ontario Association of Architects’ 2025 practice tip lays them out clearly.

Prescriptive packages

Pick the table that matches your climate zone and heating system, then meet every line in it: ceiling, walls, basement, windows, furnace or heat pump, HRV, hot water. Simple, and no computer model.

Performance path

An energy modeller compares your design to a code-compliant reference house. If yours uses no more energy, you comply. More flexible, and the right tool when you want lots of glass.

Other acceptable methods

SB-12 also accepts houses built to NRCan’s ENERGY STAR for New Homes standard version 12.6 or the 2012 R-2000 standard, with full documentation.

Which package you land in

Three things pick your package. First, the climate zone. Zone 1 is anywhere with fewer than 5,000 heating degree days, Zone 2 is 5,000 or more, and the number for your town is in Supplementary Standard SB-1. Your designer looks it up and ticks the box. Ask them which zone your lot is in rather than guessing.

Second, the heating system: the fuel and how efficient the equipment is. Third, how much glass you have. The standard summary form flags a window-to-wall ratio over 17 percent as needing better glazing, and over 22 percent the prescriptive route is off the table. That is the waterfront problem. A wall of glass facing Georgian Bay usually means the performance path.

Walls

Where ICF Walls Land Against the Wall Requirements

This is the easy part for us. SB-12 itself describes ICF wall assemblies, and the OAA practice tip notes that the ICF assemblies described in the Zone 1 and Zone 2 articles are deemed to comply with the thermal values in certain packages. The summary form even has its own lines for ICF above grade and ICF basement.

In plain terms, an ICF wall with foam on both sides of the concrete is a recognized assembly, not an oddball the examiner has to figure out. Some building departments still ask for the manufacturer’s product literature or test data. We hand that over with the permit set so nobody waits on it.

Where ICF really helps is that the wall line stops being the weak link. In a framed house the studs are thermal bridges every 16 inches and the insulation depends on how carefully it was installed. In ICF the foam is continuous and factory-made. That leaves more of your budget and attention for the parts that do vary: windows, roof insulation and air sealing.

For the full ICF story, see ICF homes in Ontario and energy-efficient homes in Ontario.

The other lines on the form

Windows, HRV and Airtightness in the Package

The walls are one line. These are the others that decide whether you pass.

  • Windows. Every package sets a minimum window performance, and the glass ratio decides how hard it bites. If you want big views, choose the windows early and let the energy design follow. Our triple-pane windows page covers when the upgrade pays.
  • HRV. The form asks for the HRV’s sensible recovery efficiency. In a tight ICF house a balanced ventilator is not optional anyway. See HRV vs ERV.
  • Airtightness. The prescriptive table on the form lists 2.5 air changes per hour at 50 pascals for a detached house, and taking credit for air sealing requires a blower door test. On the performance path the reference house is set at 3.0, and a blower door test is required if you claim tighter than that.
  • Hot water and drain water heat recovery. The form has lines for the water heater efficiency and for a drain water heat recovery unit, with a minimum 42 percent efficiency to CSA B55.1 where one is used.
  • Heating and cooling equipment. The furnace, boiler or heat pump and its efficiency. It has to be sized from a proper heat loss calculation, which is a separate document. More in heat loss calculation for a new home.

Room-by-room heat loss and radiant design is the job of our sister company OntarioHeatLoss.ca. That calculation and the SB-12 summary have to tell the same story.

Paperwork

The Forms in Your Permit Application

Here is something most people do not know. The code does not actually mandate a particular form for SB-12. But the Energy Efficiency Design Summary, the EEDS, is accepted so widely by building departments that it has become standard practice. Expect to need it.

Tiny Township’s checklist for a dwelling or cottage lists the EEDS, to be provided by the qualified person drawing the building plans. Other townships go further. North Frontenac’s checklist, for example, asks for the EEDS plus a heat loss and gain calculation with duct layout completed by an HRAI-certified designer before the permit is issued. Every township has its own list, so get yours before you submit.

  1. Building permit application with the designer’s schedules.
  2. Energy Efficiency Design Summary, prescriptive or performance version.
  3. Heat loss and gain calculation and ventilation design.
  4. Energy model report and, where claimed, blower door results, if you went the performance route.

One cottage note. Some township forms include a declaration that a building is not intended to be used on a continual basis in winter, which exempts it from the energy efficiency requirements. Think hard before you sign that on a lakefront house you might want to retire to. Ask your building department what it means for you later.

A missing or inconsistent EEDS is one of the easy ways to stall a permit. Our building permit guide covers the rest, and our design and permits service handles it for clients.

Beyond code

Going Beyond Code: ENERGY STAR and Net-Zero Ready

SB-12 is the minimum. Past it there are real programs with their own rules and inspections. ENERGY STAR for New Homes and the R-2000 standard are recognized compliance routes within SB-12 itself. Net-zero and net-zero ready are labels from separate programs. Passive House is its own demanding standard. We are not an ENERGY STAR builder and we do not sell a label. We build tight ICF houses and tell you honestly what each step past code costs and saves.

My advice: spend on the parts you cannot change later. Walls, foundation, roof insulation and air sealing are one-shot decisions. Solar panels and a better heat pump can come later. Do not buy a label for the sticker if the money would do more in the envelope.

Read ENERGY STAR certified builders in Ontario, net zero homes in Ontario and Passive House in Ontario to compare them. Rebates change often, so check Ontario energy rebates before you design around one. And for how SB-12 fits the whole permit process, head back to the building permits hub.

Have drawings and an EEDS already?

Send them over. I will check whether the package, windows and mechanical plan line up before the building department finds out they do not.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Questions people ask

FAQ

What is SB-12 in Ontario?
SB-12, Energy Efficiency for Housing, is the supplementary standard to the Ontario Building Code that sets minimum energy efficiency for new houses. It still applies under the 2024 code, which took effect January 1, 2025.
What is the difference between the prescriptive and performance paths?
Prescriptive means meeting every line of a set package for your climate zone and heating system. Performance means an energy model shows your design uses no more energy than a code-compliant reference house, which allows trade-offs such as more glass.
Do ICF walls meet SB-12?
SB-12 describes ICF wall assemblies, and they are deemed to comply with the thermal values in certain packages. Some building departments still ask for the manufacturer’s product literature or test data, so include it with the permit.
What is an EEDS form?
The Energy Efficiency Design Summary shows how your house meets SB-12. The code does not mandate a specific form, but building departments accept it so widely that it is standard practice. Tiny Township, for example, lists it on its dwelling checklist.
Which climate zone is my lot in?
Zone 1 is under 5,000 heating degree days and Zone 2 is 5,000 or more. The value for each location is in Supplementary Standard SB-1. Have your designer confirm it for your town on the EEDS.
Do I need a blower door test?
Only if you claim credit for airtightness better than the default. On the performance path a test is required when you claim tighter than 3.0 air changes per hour at 50 pascals for a detached house.

Keep going

More in this topic: Design, Plans and Permits

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home