Straight answers
The Questions People Ask Before They Call
These are the questions I hear every week, answered the way I would answer them on the phone. No sales pitch, and no “it depends” without telling you what it depends on.
Short answer: Monday to Friday, 8 to 5.
When can I reach you?
The office runs Monday to Friday, 8 to 5. We are closed on weekends, but if you cannot get away during the week, I will meet you on a Saturday. Plenty of people building a house still have a job, and I would rather work around that than lose a good project over a calendar.
Call 705-533-1633 or email info@icfhome.ca.
Short answer: Usually within one business day.
How fast will I hear back?
Send your plans or your questions and I will come back within one business day, either with questions of my own or with a first look at what you have. If it is urgent, pick up the phone. That is still the fastest way to get me.
Short answer: Simcoe County, the Georgian Bay shore and Muskoka.
Where do you build?
We are based in Tiny Township, next to Midland. We build across Simcoe County, the Georgian Bay shore and Muskoka: Tiny, Midland, Penetanguishene, Tay, Wasaga Beach, Collingwood, the Blue Mountains, Meaford, Clearview, Springwater, Oro-Medonte, Barrie, Orillia and the towns in between. The full list is on the service area page.
The Kawarthas and points east are outside our area. If you are building there, I would rather tell you now than waste your time.
Short answer: Yes, starting at $20,000.
Do you take small jobs?
Most of what we do is custom homes, foundations and additions. We do take smaller jobs, a garage, a garden suite foundation, an addition, but the minimum is $20,000. Below that, the cost of setting up a crew and the paperwork eats the job, and you would be better served by a local handyman or a small-trade contractor.
See additions and renovations and garden suites.
Short answer: Small jobs in a couple of weeks. Custom homes 1 to 2 months out.
How far ahead are you booked?
Smaller jobs we can usually fit in within a couple of weeks. A custom home usually starts one to two months after the contract is signed, and that is mostly paperwork time anyway: permits, engineering, ordering material.
The thing that actually decides your start date is the building permit, not my schedule. Read what delays building permits in Ontario before you pick a move-in date.
Short answer: By stages you can see on site.
How do payments work?
On a whole house, payments follow the stages of the build and are written into the contract so they line up with your bank’s draws. On our ICF foundation and wall work it is 10% at signing, 40% when the material is delivered to your lot, 40% before the pour, and the last 10% held back and released the way the Construction Act says.
The rule I would give any homeowner, whoever you hire: do not pay for something you cannot see on site. The full explanation is on deposits, payments and change orders.
Short answer: Tarion coverage plus our own 7-year warranty.
What warranty do I get?
We are a Tarion registered builder, so a new home we build for you is enrolled with Tarion and carries the statutory warranty. On top of that we give our own 7-year materials and workmanship warranty. We are a Certified ICF Builder and a Certified Green Builder, and we have been pouring ICF since 1995.
More on what Tarion covers: Tarion warranty in Ontario.
Short answer: Depends on the plans, the lot and the finishes. Here is how to find out fast.
What will my house cost?
I will not quote you a number per square foot over the phone, because that number is the least useful number in building. Two houses the same size can be a long way apart once you count the shape, the roof, the windows, the site work and the finishes.
Here is the honest order: run the cost calculator for a first feel, read what it really costs to build in Ontario, then ask me for a ballpark. If you have drawings, send the plans and I will price what is actually on them.
Short answer: Our showhome cost about $100 a month at the coldest part of winter.
How cheap is an ICF house to heat, really?
Our showhome is super-insulated ICF with radiant in-floor heat, and it cost about $100 a month to heat in the coldest part of winter. That is one house, not a promise for yours. Your bill depends on size, windows, airtightness and how you heat it.
Nobody lives in the showhome. It is there so you can stand in it in January and feel what a warm, quiet house is like. Book a visit.
Short answer: Possibly up to $130,000, if you qualify and the timing works.
Can I get the HST rebate on a new custom home?
Ontario’s enhanced new home HST relief can be worth up to $130,000 combined on an eligible home. For a home built for you on your own land, CRA says construction has to begin between April 1, 2026 and March 31, 2027, and there are rules about value and using it as your main home. Talk to your accountant before you count on it. The owner-built rebate details are on OntarioHSTRebates.ca, a site that covers nothing but Ontario HST rebates.
The details: the new home HST rebate for custom builds.
Short answer: No.
Do I need plans before I call you?
If you have plans, great, send them. If you do not, we can take you from an idea to drawings to a permit. Most people call with a lot, a rough size and a budget, and that is enough to start. See design, engineering and permits and the 12 steps from lot to keys.
Short answer: Yes, and you should do it before you buy.
Can you check whether my lot is buildable?
Zoning, setbacks, septic room, a well, hydro, road access and conservation authority rules decide what you can build and what it costs before the house even starts. Read building on vacant land in Ontario, then book a call and we will go through your lot together.
Still have a question?
Ask me directly. Or call 705-533-1633, Monday to Friday 8 to 5 (weekends by appointment).

