Can You Get a Mortgage on Vacant Land in Ontario?

Yes, but it is not a house mortgage. Expect a much bigger down payment, a shorter term, a higher rate and fewer lenders willing to talk to you. The good news: once you own the land, it can carry a lot of the weight on the construction loan.

For people looking at a building lot before they have a house plan or a construction mortgage lined up.

Short answer

A land loan is a different animal

A bank lending on a house knows that if you stop paying, it can sell the house. A bare lot is harder to sell, and it might not even be buildable. So lenders protect themselves with more of your money up front.

The default insurance that lets people buy a house with 5 or 10 percent down does not apply here. CMHC’s rules say plainly that loan advances on vacant land are not permitted. Lenders and brokers are clear that insured, low-down-payment mortgages are for homes, not lots. Holding land has tax effects too; see how vacant land is taxed.

Bottom line: plan on putting a lot of cash into the land, and line up the construction mortgage before you buy, not after.

What lenders want

How a lender sees a bare lot

Down payments on land vary by lender and by lot. As of 2026, published ranges from brokers and real estate lawyers look like this:

Type of lot Down payment commonly quoted
Serviced lot (municipal water, sewer, road, power) About 20 to 40 percent, depending on the source and lender
Rural, lake or raw land with no services, septic or well needed About 35 to 50 percent

Rates are usually higher than a house mortgage and terms are often short. The lender may expect you to refinance into a construction mortgage or a regular mortgage within a year or two.

Things that make a lender nervous on a rural lot: no year-round road, no proof a septic system fits, no hydro nearby, a regulated shoreline or wetland, and an odd shape that limits where the house can go. Every one of those is also on my lot buildability checklist, and that is not a coincidence. A lender is asking the same question you should: can a house actually go here?

Serviced vs unserviced

Why services change the answer

A serviced lot in town is close to a sure thing. Water and sewer are at the lot line, the road is plowed, and there are houses beside it. Lenders treat it much more like housing.

A rural lot needs a well, a septic system, a driveway, hydro and often a conservation authority sign-off before anyone can build. Until those are proven, the lot’s value depends on things nobody has checked yet. That is why the down payment climbs.

You can help your own case. Bring the lender whatever you have: a zoning confirmation, a septic test pit, a survey, a hydro quote. A lot with answers looks less risky than a lot with question marks. For the costs that come with raw land, see the hidden costs of buying land and the bigger guide to building on vacant land.

Where to borrow

Who lends on land

Banks

Usually more comfortable with serviced, buildable lots. Start here if you bank with them already, but do not be surprised by a no on raw rural land.

Credit unions

Often more flexible on rural, recreational and waterfront lots. A local credit union knows the area and may know the road.

Private lenders

Will finance land others will not, for short terms at higher rates. Useful as a bridge, expensive as a plan.

Vendor take-back. Sometimes the seller lends you part of the price and takes a mortgage back on the lot. It is common on rural and recreational land, often with a balloon payment at the end. Have your lawyer read the terms, especially what happens if your construction mortgage needs that seller to step aside.

A mortgage broker who does land and construction deals can save you a lot of phone calls. For more detail on land loans, there is a longer guide at BuildersOntario.com, our sister information site.

The payoff

How the land becomes your down payment on the build

Here is the part people miss. Once you own the lot, its value can count as your equity in the construction mortgage. Pay off the land, or most of it, and you may need much less cash when you start building.

CMHC’s construction rules say any equity in the land must go toward building and finishing the house, and you cannot take equity out as cash. In plain words, the land is working for the house, not for your vacation.

The construction lender will still want permit-ready drawings, a real budget, a builder they trust and a schedule of draws. Money comes out in stages as work is done, which is how I explain it in the guide to construction mortgages in Ontario. On HST and how the rebate fits the financing, see construction financing and HST.

Avoid this

Where people go wrong with land loans

  1. Buying the lot with no plan for the construction loan. Talk to the construction lender first. Ask what they need from the land side.
  2. A short land loan and a long permit. If your land loan comes due while the septic design and permit are still in progress, you are refinancing in a hurry. Build in slack. See how long a custom home takes.
  3. Spending every dollar on the land. The build needs cash too, for drawings, permits, fees and the gap before the first draw. If you also own a house, decide early whether you sell first or build first.
  4. Skipping the conditions. Make the offer conditional on financing and on checking the lot.

Get a realistic number before you talk to the bank

A lender takes you more seriously with a real build budget in hand. Tell me the lot, the size and the style, and I will give you a ballpark you can take to the meeting.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Questions people ask

FAQ

How much down payment do I need for vacant land in Ontario?
It depends on the lender and the lot. Published ranges as of 2026 run from about 20 to 40 percent for serviced lots and about 35 to 50 percent for rural or raw land with no services.
Does CMHC insure mortgages on vacant land?
No. CMHC rules say loan advances on vacant land are not permitted. Insured mortgages are for homes, including homes under construction, not bare lots.
Can my land count as the down payment on a construction mortgage?
Often, yes. Equity in land you own can count toward the construction loan. CMHC rules say that equity must go into building the house, and you cannot take it out as cash.
Are credit unions better for land loans?
Often more flexible on rural, recreational and waterfront lots than big banks. Rates and terms vary, so compare and ask a broker who does land deals.
What is a vendor take-back mortgage on land?
The seller lends you part of the price and registers a mortgage on the lot. It is common on rural land, often with a balloon payment. Have your lawyer check how it fits with a future construction mortgage.

Keep going

More in this topic: Financing, Tax and Rebates

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home