Well Drilling Cost in Simcoe County: What to Budget

Published Ontario cost guides put a complete drilled well somewhere between about $9,000 and $30,000 once you add the pump, tank and wiring. Where you land in that range depends on one thing nobody can see: how deep the water is.

For people buying or building on a rural lot around Georgian Bay: how drillers price a well, the tests that matter, the treatment most country homes need, and what happens when the first hole comes up dry.

Short answer

Nobody knows how deep until the rig hits water

A driller prices by the foot because nobody can see underground. Not the driller, not the agent, and not me. The neighbour’s well is a clue, not a promise.

Before you buy, look up the wells around the lot. The province’s free Well Record Map lets you click on nearby wells and see how deep they went and what they drilled through. If every well on the road is shallow, good. If they are all deep, budget for deep.

Published guides say drilled wells in Canada commonly run 100 to 300 feet. At a per-foot price, those are very different cheques.

Bottom line: carry a well number in your budget that assumes the deep end of what the neighbours hit, and treat anything less as found money. Never let a land deal close on the assumption that water is cheap.

The numbers

What a drilled well costs, piece by piece

A “well” on your quote is really five things: the hole, the casing, the pump and tank, the wiring, and the line to the house. Some drillers quote all of it, some only the hole. Compare like with like.

Item What it covers Published range (2025-2026 guides)
Drilling The hole itself, priced per foot About $70 to $150 a foot
Hard rock Slower drilling once the bit is in bedrock Can raise the drilling price by 100 to 150 percent
Minimum footage Some drillers bill a minimum depth Often 100 feet
Casing Steel pipe that keeps surface water and loose soil out Priced per foot by the driller; ask for it as its own line
Submersible pump Pump in the well About $900 to $3,000
Pressure tank Tank in the mechanical room About $400 to $2,500
Electrical Wiring from the panel to the pump About $500 to $1,500
Water treatment Softener, iron filter, UV and so on About $1,500 to $7,000

Those ranges come from published cost guides, not local quotes. For Ontario as a whole they put a finished well at roughly $9,000 to $24,000, with some putting the top end near $30,000. Get two quotes in writing.

The line from the well to the house is usually the excavator’s job, not the driller’s. It has to be deep enough to stay below frost (see frost depth in Ontario), and on a long cottage lot that trench adds up. Ask who is digging it and who is paying for it before anybody shows up.

What to ask the driller to put in writing

  1. Price per foot of drilling, and the price per foot of casing.
  2. Any minimum footage, mobilization or “rig move” charge.
  3. What is included: grouting, developing the well, disinfection, cap.
  4. Pump, tank and hookup, or are those someone else’s job.
  5. What you pay if the hole is dry or the flow is too weak.

Paperwork

Water tests and records the bank and the township want

Three pieces of paper matter: the well record, a bacteria test and a chemistry test. Get all three.

The well record

Under Ontario’s Wells Regulation (Reg. 903), wells are built by licensed well contractors using licensed technicians. Ask to see the licences before the rig starts. The contractor owes you a copy of the well record within 14 days of finishing the structural stage, and files it with the province within 30 days. Keep it. Your building department, lender and next buyer may all ask for it.

The bacteria test (free)

The Simcoe Muskoka District Health Unit offers free bacteria testing of private well water through Public Health Ontario’s lab. You pick up a bottle at a designated location, take the sample right before you drop it off, and get it in Monday to Thursday before 4:30. They do not take samples on Fridays, and the lab has to receive it within 48 hours. The province recommends testing a private well at least three times a year.

The chemistry test (paid)

The free test only looks for bacteria. Hardness, iron, sulphur, sodium, nitrates and the rest need a licensed private lab, and that costs money. Published guides put water testing anywhere from about $50 for a single test to several hundred for a full package. Do it once on a new well before you buy any treatment equipment.

Lenders vary. Many want proof of drinkable water before they release the last of a construction mortgage. Ask your lender early what they need and when, so a lab result does not hold up your final draw.

Treatment

Hard water, iron, sulphur and bacteria: treatment costs

Most country wells need something. That is normal, and not a reason to walk away from a lot.

Hard water

Scale on taps, kettles and fixtures. A softener is the usual fix. Size it to the lab result, not to a sales pitch.

Iron and sulphur

Orange or black stains, or the rotten-egg smell. An iron filter ahead of the softener is common. How you treat sulphur depends on how strong it is. Test first.

Bacteria

A failed test means find the cause first: a bad cap, surface water, a nearby septic. Then disinfect, and often add UV with a sediment filter.

Published guides put a treatment system at roughly $1,500 to $7,000, depending on how many problems you are solving. The free in-home test from the fellow selling softeners is a sales tool, not a lab result. Test first, buy second, and leave floor space, a drain and power for the equipment in the mechanical room.

Site plan

Well-to-septic setbacks that shape your site plan

On a big rural lot, setbacks are a box to tick. On a narrow cottage lot, they decide where the house goes, and your neighbours’ wells and septics count too. SepticReplacement.ca has a full guide to well and septic setbacks.

From To Minimum clearance (Ontario Building Code, Part 8)
Septic tank Any well 15 metres in the code, about 50 feet
Leaching bed Well with watertight casing at least 6 metres (about 20 feet) deep 15 metres, about 50 feet
Leaching bed Any other well 30 metres, about 100 feet

The Wells Regulation also has its own rules about keeping a new well away from sewage systems and other sources of contamination. A good driller knows them. Your septic designer has to know where the well is going, and vice versa. That is why I like to see the well, septic and house drawn on one plan before anyone digs. Our septic cost guide covers the other half of that puzzle.

The province says a well cap should typically sit about 40 centimetres, roughly 16 inches, above ground. Keep it out of the driveway, the plow’s path and low spots where water pools.

When it goes wrong

When the first hole comes up dry

It happens. In most drilling contracts you pay for the footage drilled whether it finds water or not. Read that clause before you sign. When the first hole is dry or weak, the usual options are:

  • Go deeper. Often the cheapest next step, and the driller is already set up.
  • Try another spot. Only if the setbacks still work. Check the site plan before the rig moves.
  • Ask about improving the flow. Some drillers offer methods to open up a low-yield well. Ask what they recommend and what it costs.
  • Add storage. A weak well can fill a holding tank slowly and still run a house.

A hole you do not use cannot just be left. Ontario requires an unused well to be plugged and sealed so it does not channel surface water into the aquifer. Ask the driller to price that too.

This is why I tell people buying land to deal with water before they fall in love with a view. If the seller will allow it, a well drilled before closing, or a condition in the offer, takes the biggest unknown off the table. More on that in hidden costs of buying land.

Is my lot buildable?

Send me the lot. I will look at the well records around it, the septic area and the hydro, and tell you honestly what I would budget before you commit.

Where this fits

Water is one line on a longer list

Hydro has its own surprises, covered in getting hydro to a rural lot. Clearing and access are in lot acquisition and site preparation. For the full picture of what raw land costs, start with building on vacant land in Ontario. Building in our own back yard? See custom homes in Tiny Township.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Questions people ask

FAQ

How much does it cost to drill a well in Simcoe County?
Published 2025-2026 cost guides put a complete drilled well in Ontario at roughly $9,000 to $30,000, with drilling itself around $70 to $150 a foot. Depth is the big variable, so check the well records around your lot and get two written quotes from licensed local drillers.
How deep will my well be?
Nobody knows until the rig hits water. Drilled wells in Canada commonly run 100 to 300 feet. Ontario’s free Well Record Map shows how deep nearby wells went, which is the best clue you can get before drilling.
Is well water testing free in Simcoe County?
Bacteria testing is free through the Simcoe Muskoka District Health Unit and Public Health Ontario’s lab. Drop samples off Monday to Thursday before 4:30, never Fridays. Chemistry tests for hardness, iron and the rest need a licensed private lab and cost money.
How far does a well have to be from a septic system in Ontario?
Under Part 8 of the Ontario Building Code, a septic tank must be at least 15 metres (about 50 feet) from a well. A leaching bed must be 15 metres from a well cased watertight to at least 6 metres deep, and 30 metres (about 100 feet) from any other well.
Who pays if the driller hits a dry hole?
In most drilling contracts you pay for the footage drilled whether it finds water or not. Read that clause before you sign. An unused hole must also be plugged and sealed under Ontario rules.
Should I drill the well before I buy the lot?
If the seller will allow it, yes, or make the offer conditional on water. Water is the biggest unknown on a rural lot.

Keep going

More in this topic: Land, Lots and Site Work

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home