Year-Round vs Seasonal Cottage: What Changes in the Build

A seasonal cottage and a year-round house can look the same from the dock. Underneath, the foundation, the insulation, the plumbing, the heat and the paperwork are different. If there is any chance you will retire there or spend Christmas there, build it year-round now.

For people planning a new cottage or replacing an old one: what a seasonal build skips, what the building code and the township expect, and why converting later usually costs more than doing it once.

Short answer

The real difference is what happens in February

A seasonal cottage is built to be closed up in the fall. You drain the water, shut off the power, and walk away until May. A year-round house has to keep people warm, keep water flowing and keep the road open on the coldest night of the year. A seasonal cottage that is not your main home usually does not qualify; see who qualifies for the new home HST rebate.

Seasonal or year-round, a cottage you sell one day is usually taxed as a capital gain. Here is how cottage capital gains work and how the principal residence exemption can cut the bill.

That one difference touches almost every part of the build. Here is the quick version:

Item Seasonal cottage Year-round home
Foundation Sometimes piers or blocks, depending on the township and design Footings below frost or a properly insulated slab
Energy code May qualify for a seasonal-use exemption, where accepted Must meet SB-12
Plumbing Designed to drain Protected from freezing, inside the heated envelope
Heat Wood stove or space heaters A permanent, designed heating system
Access Summer road is fine Plowed road or your own plow plan
Warranty Tarion excludes seasonal dwellings Tarion coverage for a contract home
Bottom line: the gap between seasonal and year-round is not a few extra batts. It is the foundation, the mechanical systems and the paperwork, and those are the expensive things to change later.

Below grade

Foundation and frost

Frost is the first thing that separates a cottage from a house. A building that is heated all winter needs a foundation that frost cannot lift. In Ontario that means footings below frost depth, or a slab insulated so the frost stays out from under it. Our guide to footing depth and frost in Ontario explains how deep and why.

Lots of old cottages sit on posts or blocks above frost. That works for a building that is empty in winter and allowed to move a little. Turn the heat on and live in it, and the doors start sticking and the plumbing starts complaining.

Lenders notice too. Mortgage insurer Sagen, for one, requires a permanent foundation below the frost line for its year-round second-home category, and accepts a floating foundation only in its vacation category. That is why we put most cottages on an ICF foundation. It is the same frost-protected, insulated foundation a year-round house gets, so you are never stuck with a three-season structure.

The envelope

Insulation, SB-12 and the seasonal-use declaration

Ontario’s energy rules for houses, set out in the building code and supplementary standard SB-12, are aimed at homes intended for occupancy on a continuing basis during the winter months. A true seasonal cottage may be able to use an exemption.

Some townships handle this with a declaration you sign at permit time. Gravenhurst’s cottage declaration, for example, has the owner confirm the cottage is not intended for occupancy on a continuing basis in winter. Leeds and the Thousand Islands goes further. Its seasonal dwelling affidavit says the building does not meet the SB-12 energy requirements for year-round use, is not fit for year-round use, and that using it against the affidavit can lead to charges.

Two things to know before you sign one:

  1. Converting later needs a permit. Leeds and the Thousand Islands requires a new building permit to convert a seasonal dwelling, with upgrades to insulation, air and vapour barriers, heating, ventilation and windows. That often means opening finished walls.
  2. Not every township handles it the same way. Ask your building department whether they accept a seasonal-use declaration and what it commits you to.

For the full picture on the energy code, read SB-12 explained. ICF walls are one of the easier ways to meet it, which is one reason I rarely build a seasonal shell anymore.

Systems

Plumbing, heat and power

Plumbing

Seasonal plumbing is built to drain: low points, drain valves, and a checklist taped inside the cupboard. Year-round plumbing stays inside the heated part of the house. No supply lines in outside walls, crawlspaces or unheated porches. The water line from the well or the lake has to be buried below frost or protected all the way into the house.

Heat

A wood stove is lovely in October. It is not a heating system when you are away for a week in January. A year-round house needs a designed heating system sized from a proper heat loss. We often use radiant in-floor heat in ICF homes; our guide to the best heating for an ICF home compares the options.

When the power goes out

Rural power goes out in storms, and cottage roads are the last to get fixed. Plan backup heat and a way to protect the plumbing. See power outages and backup heat in an ICF home.

Below ground and out the driveway

Septic, water and winter road access

Under Ontario’s Part 8 rules, a house’s septic is sized from the number of bedrooms plus the larger of the floor area or the fixture count. That is the same whether you use it in July or all year. What changes is how hard the system works. A system that sits idle most of the year gets a holiday a year-round system never gets. If you are replacing an old cottage septic for year-round use, have the designer size it for the house you are actually building.

The well matters too. A shallow well or a summer lake line that is fine in July can freeze or run short in winter. Our well drilling guide covers drilled wells.

Then there is the road. Some township roads are not maintained in winter at all. Tiny Township, for example, posts annual winter closures on sections of several concession roads with no winter maintenance. A private lane is plowed by you and your neighbours or not at all. Read building on a private or seasonal road before you buy a year-round lot on a summer road.

Paperwork

Insurance, warranty and zoning

Warranty. The Ontario New Home Warranties Plan Act excludes a dwelling built for occupancy for temporary periods or for seasonal purposes, which is why some townships also ask you to acknowledge that a seasonal cottage is not covered by Tarion. A year-round contract home is a different story. Our Tarion warranty guide explains what it covers. On top of that, we give a 7-year materials and workmanship warranty on our homes.

Insurance. Insurers care about whether the place is lived in, heated and checked on. Ask your broker how they treat a seasonal versus a year-round home, and what their conditions are for a house left empty in winter.

Zoning. Some zoning by-laws have separate seasonal residential zones. Springwater’s by-law, for example, lists a Residential Seasonal zone and a Residential Conversion zone, and does not allow additional residential units in the seasonal zone. Ask the planning department what your zone allows before you design a year-round house there.

Building a cottage you might live in someday?

Send me the lot and how you plan to use it. I will tell you what a year-round build adds and what it saves you later.

For budgets, see what it costs to build a cottage in Ontario. For everything else on the water, start at our waterfront and cottage homes hub.

Questions people ask

FAQ

Does a seasonal cottage have to meet SB-12?
Ontario’s energy rules for houses are aimed at homes occupied on a continuing basis in winter. Some townships accept a seasonal-use declaration that exempts a true seasonal cottage. Ask your building department whether they accept one and what it commits you to.
Can I convert a seasonal cottage to year-round later?
Yes, with a building permit. Expect upgrades to insulation, air and vapour barriers, heating, ventilation, windows and often the foundation and plumbing. It usually costs more than building year-round from the start.
Is a seasonal cottage covered by Tarion?
No. The Ontario New Home Warranties Plan Act excludes dwellings built for temporary or seasonal occupancy. A year-round contract home can be covered.
Does a year-round cottage need a bigger septic?
Part 8 sizes a house’s septic from bedrooms plus the larger of floor area or fixture count, not by season. But a year-round system works harder, so have the designer size it for the house you are actually building.
Can a cottage sit on piers if I want to live there year-round?
For a heated year-round house, you want footings below frost or a properly insulated slab. Piers above frost move with the ground, and some lenders will not treat them as a permanent foundation.
Will the township plow my road if I live there all year?
Only if it is a public road maintained in winter. Some township roads are closed in winter, and private roads are plowed by the owners. Check before you buy.

Free book

How to Build a Home Without Going Broke

Not ready to call anyone yet? Fair enough. Read the book first: the costly mistakes I have watched people make over 45 years of building, and how to avoid every one of them. Free PDF, straight to your inbox.

Keep going

More in this topic: Waterfront, Cottage and Rural

See all 12 steps of building a custom home, with every guide on the site  |  Straight answers: hours, payments, warranty, where we build

How to Build a Home Without Going Broke

Building a home in Ontario? Don't go in blind.

Get the free book How to Build a Home Without Going Broke — the costly mistakes most people make, and how to avoid them. Instant PDF to your inbox.

Real Enbridge bill: even in the coldest month, our ≈3,000 sq ft ICF show home cost just $117.45 to heat — kept at 20 °C (the month before: $99.21). See the actual bill → Unoccupied show home, heating only; your costs vary with size, finishes and use.
See a Completed ICF Home